7 Bitumen Roofing<br />

Where roof finishings are required to be of a bitumen and sand mix this shall be composed of a mix to the<br />

following proportion ( by weight ) :<br />

Bitumen 60 /70 penetration 13 %<br />

Filler (passing 200 sieve) 11 %<br />

Sand 76 %<br />

Mixing shall be carried out in an approved machine until all materials are thoroughly mixed. The mixing<br />

temperature shall be between 163OC and 191OC and it shall be applied at a temperature sufficient to<br />

maintain the workability of the mix. The covering shall be laid in one coat to give a consolidated thickness<br />

of 20mm after rolling with a light hand roller. 150x150mm angle fillets shall be laid at edges of roofs<br />

against parapets etc., properly bonded to the roof covering and with top edges turned into joints of walls.<br />

The covering shall also be pressed into rainwater outlets and under flashings.<br />

8 Asphalt<br />

Asphalt roofing and tanking shall be executed by an approved specialist using mastic asphalt to BS 988 .<br />

The asphalt shall be applied in the thickness and number of coats described in the Particular Conditions,<br />

with each successive coat breaking joints at least 300mm (12") and with properly formed angles, double<br />

angle fillets and fair edges .<br />

Joints of blockwork shall be raked out and all vertical surfaces hacked for key.<br />

Horizontal work shall be laid on a layer of stout sheathing felt.<br />

9 Completion<br />

On completion all roofs etc are to be left sound, water- tight and in clean condition before handing over.<br />