MoraËa: akumulacija i HE Nisko Andrijevo,<br />
uzvodna akumulacija i HE Dubravica, akumulacija<br />
i HE Grla, te nizvodne akumulacije i HE<br />
RasloviÊi, MilunoviÊi i Zlatica (kao u Varijanti<br />
1),<br />
Lim: viπenamjenske akumulacije i HE na<br />
pritocima, a na glavnom toku samo kanalske<br />
protoËne HE,<br />
∆ehotina: akumulacija Milovci i derivacijska<br />
HE u rijeku Taru,<br />
Piva: akumulacije (kao u Varijanti 1), HE<br />
©avnik s derivacijom iz akumulacije na rijeci<br />
Bijela i HE Timar s akumulacijom na rijeci<br />
Bukovici.<br />
U obje varijante ista su rjeπenja za Ibar sa HE BaÊ<br />
i za HES Buk Bijela na rijeci Drini. Obje varijante<br />
su uvjetne, a moguÊe je i kombiniranje varijantnih<br />
rjeπenja na pojedinim rijekama (onih koja su<br />
meappleusobno neovisna).<br />
U tablici 7 dan je pregled preostalog tehniËki<br />
iskoristivog potencijala glavnih vodotoka za<br />
varijantu 1 i 2, i to u prirodnom pravcu toka, te<br />
za sluËaj prevoappleenja dijela voda Tare u MoraËu,<br />
prema podacima iz Vodoprivredne osnove Crne<br />
Gore [5].<br />
Variant 2, which as an alternative includes the<br />
Water Management Master Plan of Montenegro,<br />
2001, predicts the construction of new reservoirs<br />
and power plants, as follows:<br />
−<br />
−<br />
−<br />
−<br />
−<br />
Tara: the storage reservoirs and hydroelectric<br />
power plants of Tepca, Mojkovac, Niski Æuti<br />
Krπ, Mateπevo and Opasanica,<br />
MoraËa: the Nisko Andrijevo Storage Reservoir and<br />
Hydroelectric Power Plant, the upriver Dubravica<br />
Storage Reservoir and Hydroelectric Power Plant,<br />
the Grla Storage Reservoir and Hydroelectric<br />
Power Plant, and the downriver storage reservoirs<br />
and hydroelectric power plants of RasloviÊi,<br />
MilunoviÊi and Zlatica (as in Variant 1),<br />
Lim: multipurpose storage reservoirs and hydroelectric<br />
power plants on the tributaries, and<br />
on the main course only channel run-off-river<br />
hydroelectric power plants,<br />
∆ehotina: the Milovci Storage Reservoir and derivation<br />
Hydroelectric Power Plant to the Tara River,<br />
Piva: storage reservoirs (as in Variant 1), the<br />
©avnik Hydroelectric Power Plant with a derivation<br />
from the storage reservoir on the Bijela<br />
River and the Timar Hydroelectric Power Plant<br />
with a storage reservoir on the Bukovica River.<br />
In both variants, the solutions are the same for Ibar<br />
with the BaÊ Hydroelectric Power Plant and for the<br />
Buk Bijela Hydroenergy System on the Drina River.<br />
Both variants are conditional and it is possible<br />
to combine variant solutions on individual rivers<br />
(those which are mutually independent).<br />
Table 7 presents the remaining technically exploitable<br />
potential of the main waterways for Variants 1<br />
and 2, in the natural direction of flow and for the<br />
case of the diverted part of the water of the Tara River<br />
into the MoraËa River, according to data from the<br />
Water Management Master Plan of Montenegro [5].<br />
Tablica 7 − Preostali tehniËki iskoristivi hidroenergetski potencijal glavnih vodotoka za varijantu 1 i 2, u<br />
prirodnom pravcu toka i uz prevoappleenje voda Tare u MoraËu [3]<br />
Table 7 − Remaining technically exploitable hydroenergy potential of the main waterways for Variants 1<br />
and 2, in the natural direction of flow and the redirected water of the Tara River into the MoraËa River [3]<br />
Pravac prirodnog oticanja /<br />
Natural river course<br />
Prevoappleenje voda /<br />
Diverted water<br />
Rijeka / River<br />
Varijanta 1 / Variant 1 Varijanta 2 / Variant 2<br />
Varijanta 1 / Variant 1 Varijanta 2 / Variant 2<br />
22,2 m 3 /s 15,2 m 3 /s 22,2 m 3 /s 15,2 m 3 /s<br />
(GWh) (GWh) (GWh) (GWh) (GWh) (GWh)<br />
Tara 803 1 326 1 420 1 169 1 650 1 453<br />
MoraËa 1 198 1 332 1 564 1 448 1 708 1 590<br />
Lim 826 933 826 826 933 933<br />
∆ehotina 136 218 136 136 218 218<br />
Piva 316 365 316 316 365 365<br />
Ibar 48 48 48 48 48 48<br />
Buk Bijela (1/3) 380 380 330 345 330 345<br />
Ukupno / Total 3 707 4 602 4 639 4 288 5 252 4 952<br />
Zeljko, M., »anoviÊ, M., Energetski sektor Crne Gore..., Energija, god. 56(2007), br. 3., str. 292∑327<br />
Zeljko, M., »anoviÊ, M., The Current Situation and Future..., Energija, vol. 56(2007), No. 3, pp. 292∑327<br />
310