MoraËa: akumulacija i HE Nisko Andrijevo,<br />

uzvodna akumulacija i HE Dubravica, akumulacija<br />

i HE Grla, te nizvodne akumulacije i HE<br />

RasloviÊi, MilunoviÊi i Zlatica (kao u Varijanti<br />

1),<br />

Lim: viπenamjenske akumulacije i HE na<br />

pritocima, a na glavnom toku samo kanalske<br />

protoËne HE,<br />

∆ehotina: akumulacija Milovci i derivacijska<br />

HE u rijeku Taru,<br />

Piva: akumulacije (kao u Varijanti 1), HE<br />

©avnik s derivacijom iz akumulacije na rijeci<br />

Bijela i HE Timar s akumulacijom na rijeci<br />

Bukovici.<br />

U obje varijante ista su rjeπenja za Ibar sa HE BaÊ<br />

i za HES Buk Bijela na rijeci Drini. Obje varijante<br />

su uvjetne, a moguÊe je i kombiniranje varijantnih<br />

rjeπenja na pojedinim rijekama (onih koja su<br />

meappleusobno neovisna).<br />

U tablici 7 dan je pregled preostalog tehniËki<br />

iskoristivog potencijala glavnih vodotoka za<br />

varijantu 1 i 2, i to u prirodnom pravcu toka, te<br />

za sluËaj prevoappleenja dijela voda Tare u MoraËu,<br />

prema podacima iz Vodoprivredne osnove Crne<br />

Gore [5].<br />

Variant 2, which as an alternative includes the<br />

Water Management Master Plan of Montenegro,<br />

2001, predicts the construction of new reservoirs<br />

and power plants, as follows:<br />

−<br />

−<br />

−<br />

−<br />

−<br />

Tara: the storage reservoirs and hydroelectric<br />

power plants of Tepca, Mojkovac, Niski Æuti<br />

Krπ, Mateπevo and Opasanica,<br />

MoraËa: the Nisko Andrijevo Storage Reservoir and<br />

Hydroelectric Power Plant, the upriver Dubravica<br />

Storage Reservoir and Hydroelectric Power Plant,<br />

the Grla Storage Reservoir and Hydroelectric<br />

Power Plant, and the downriver storage reservoirs<br />

and hydroelectric power plants of RasloviÊi,<br />

MilunoviÊi and Zlatica (as in Variant 1),<br />

Lim: multipurpose storage reservoirs and hydroelectric<br />

power plants on the tributaries, and<br />

on the main course only channel run-off-river<br />

hydroelectric power plants,<br />

∆ehotina: the Milovci Storage Reservoir and derivation<br />

Hydroelectric Power Plant to the Tara River,<br />

Piva: storage reservoirs (as in Variant 1), the<br />

©avnik Hydroelectric Power Plant with a derivation<br />

from the storage reservoir on the Bijela<br />

River and the Timar Hydroelectric Power Plant<br />

with a storage reservoir on the Bukovica River.<br />

In both variants, the solutions are the same for Ibar<br />

with the BaÊ Hydroelectric Power Plant and for the<br />

Buk Bijela Hydroenergy System on the Drina River.<br />

Both variants are conditional and it is possible<br />

to combine variant solutions on individual rivers<br />

(those which are mutually independent).<br />

Table 7 presents the remaining technically exploitable<br />

potential of the main waterways for Variants 1<br />

and 2, in the natural direction of flow and for the<br />

case of the diverted part of the water of the Tara River<br />

into the MoraËa River, according to data from the<br />

Water Management Master Plan of Montenegro [5].<br />

Tablica 7 − Preostali tehniËki iskoristivi hidroenergetski potencijal glavnih vodotoka za varijantu 1 i 2, u<br />

prirodnom pravcu toka i uz prevoappleenje voda Tare u MoraËu [3]<br />

Table 7 − Remaining technically exploitable hydroenergy potential of the main waterways for Variants 1<br />

and 2, in the natural direction of flow and the redirected water of the Tara River into the MoraËa River [3]<br />

Pravac prirodnog oticanja /<br />

Natural river course<br />

Prevoappleenje voda /<br />

Diverted water<br />

Rijeka / River<br />

Varijanta 1 / Variant 1 Varijanta 2 / Variant 2<br />

Varijanta 1 / Variant 1 Varijanta 2 / Variant 2<br />

22,2 m 3 /s 15,2 m 3 /s 22,2 m 3 /s 15,2 m 3 /s<br />

(GWh) (GWh) (GWh) (GWh) (GWh) (GWh)<br />

Tara 803 1 326 1 420 1 169 1 650 1 453<br />

MoraËa 1 198 1 332 1 564 1 448 1 708 1 590<br />

Lim 826 933 826 826 933 933<br />

∆ehotina 136 218 136 136 218 218<br />

Piva 316 365 316 316 365 365<br />

Ibar 48 48 48 48 48 48<br />

Buk Bijela (1/3) 380 380 330 345 330 345<br />

Ukupno / Total 3 707 4 602 4 639 4 288 5 252 4 952<br />

Zeljko, M., »anoviÊ, M., Energetski sektor Crne Gore..., Energija, god. 56(2007), br. 3., str. 292∑327<br />

Zeljko, M., »anoviÊ, M., The Current Situation and Future..., Energija, vol. 56(2007), No. 3, pp. 292∑327<br />

310