Figure 9. Simulated cumulative volume of solid waste under Scenario A<br />

Scenario B – Recycling Institutional Waste<br />

Scenario B characterized what would<br />

happen if individuals in <strong>the</strong> different institutions<br />

will have <strong>the</strong>ir waste recycled. If Scenario B will<br />

be imposed, of <strong>the</strong> 843,600 m3 of accumulated<br />

waste generated until year 2015 or for a period<br />

of eight years, 671,114 m3 will be all disposed<br />

off in <strong>the</strong> dumpsite. Never<strong>the</strong>less, because of<br />

<strong>the</strong> recycling project <strong>the</strong>re will be 88,021 m3<br />

recovered recyclable waste for a period of 8<br />

years or an equivalent volume of recovered<br />

recyclable waste from 185 m3/wk to 225 m3/wk<br />

on year 2015. Figure 10 shows <strong>the</strong> trend in <strong>the</strong><br />

cumulative volume of solid waste as simulated<br />

under Scenario B.<br />

Figure 10. Simulated cumulative volume of solid waste under Scenario B<br />

J.B. Guzman<br />

25