16.11.2014 Views

MOTOX Gearbox for monorail conveyors - DS TECH

MOTOX Gearbox for monorail conveyors - DS TECH

MOTOX Gearbox for monorail conveyors - DS TECH

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Commissioning<br />

5<br />

WARNING<br />

Secure the drive unit to prevent it from being started up unintentionally.<br />

Attach a warning notice to the start switch.<br />

WARNING<br />

Remove any oil spillage immediately with an oil-binding agent in compliance with<br />

environmental requirements.<br />

CAUTION<br />

On cylindrical-roller bearings in the input unit, undershooting the minimum radial <strong>for</strong>ce can<br />

damage bearings.<br />

Prolonged test runs when off-load must be kept to a minimum.<br />

5.1 Checking the oil level prior to commissioning<br />

Check the oil level be<strong>for</strong>e commissioning and correct it if necessary, see Checking and<br />

changing lubricants (Page 41).<br />

<strong>Gearbox</strong>es with long-term preservation are delivered with a full tank of oil. We recommend a<br />

complete oil change if your unit is left in storage <strong>for</strong> more than 24 months, see Checking and<br />

changing lubricants (Page 41).<br />

5.2 Fitting the gearbox ventilation<br />

5.2.1 Screwing in the vent filter or pressure breather valve without securing clip<br />

In the case of gearboxes with housing ventilation, the necessary vent filter or pressure<br />

breather valve without a securing clip is delivered separately. They must be replaced with<br />

the appropriate vent plug be<strong>for</strong>e starting up the gearbox.<br />

BA 2515<br />

Operating Instructions, 04/2011 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!