MOTOX Gearbox for monorail conveyors - DS TECH
MOTOX Gearbox for monorail conveyors - DS TECH
MOTOX Gearbox for monorail conveyors - DS TECH
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Commissioning<br />
5<br />
WARNING<br />
Secure the drive unit to prevent it from being started up unintentionally.<br />
Attach a warning notice to the start switch.<br />
WARNING<br />
Remove any oil spillage immediately with an oil-binding agent in compliance with<br />
environmental requirements.<br />
CAUTION<br />
On cylindrical-roller bearings in the input unit, undershooting the minimum radial <strong>for</strong>ce can<br />
damage bearings.<br />
Prolonged test runs when off-load must be kept to a minimum.<br />
5.1 Checking the oil level prior to commissioning<br />
Check the oil level be<strong>for</strong>e commissioning and correct it if necessary, see Checking and<br />
changing lubricants (Page 41).<br />
<strong>Gearbox</strong>es with long-term preservation are delivered with a full tank of oil. We recommend a<br />
complete oil change if your unit is left in storage <strong>for</strong> more than 24 months, see Checking and<br />
changing lubricants (Page 41).<br />
5.2 Fitting the gearbox ventilation<br />
5.2.1 Screwing in the vent filter or pressure breather valve without securing clip<br />
In the case of gearboxes with housing ventilation, the necessary vent filter or pressure<br />
breather valve without a securing clip is delivered separately. They must be replaced with<br />
the appropriate vent plug be<strong>for</strong>e starting up the gearbox.<br />
BA 2515<br />
Operating Instructions, 04/2011 31