MOTOX Gearbox for monorail conveyors - DS TECH
MOTOX Gearbox for monorail conveyors - DS TECH
MOTOX Gearbox for monorail conveyors - DS TECH
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Service and maintenance<br />
8.3 Replacing bearings<br />
8.3 Replacing bearings<br />
Note<br />
Bearing life depends very much on operating conditions. It is, there<strong>for</strong>e, very difficult to<br />
calculate it reliably. In the operating conditions specified by the operator, bearing life can be<br />
calculated and indicated on the rating plate. If no in<strong>for</strong>mation is given, changes in vibration<br />
and noise pattern can serve as an indicator that an immediate bearing replacement is<br />
necessary.<br />
8.4 Checking the gearbox <strong>for</strong> leaks<br />
Oil or grease escaping in small quantities from the shaft sealing ring should be regarded as<br />
normal during the running-in phase of 24 hours running time.<br />
If the quantities escaping are significant or leaking continues after the running-in phase, the<br />
shaft sealing ring must be replaced to prevent consequential damage.<br />
Shaft sealing rings are subject to natural wear. Service life depends on operating conditions.<br />
We recommend that shaft sealing rings are included in periodic maintenance and servicing<br />
work on the system.<br />
BA 2515<br />
Operating Instructions, 04/2011 53