Ridgidrain Infiltration 1.6<br />

Infiltration Devices<br />

Sustainable Urban Drainage Systems (SUDS) is becoming more prevalent<br />

in <strong>drainage</strong> design [Please refer to <strong>Polypipe</strong> Stormwater management<br />

technical manual]. One key SUDS technique is to encourage surface water<br />

to infiltrate into the ground at source.<br />

The Ridgidrain pipe <strong>system</strong> is available in unperforated, half-perforated<br />

and fully perforated configurations. The perforated and half-perforated<br />

pipes may be used to form several different infiltration devices. With<br />

carrier pipes used to transport surface water to the point of infiltration,<br />

enabling a single integrated <strong>system</strong> to be used, where required.<br />

Typical infiltration structures, using the Ridgidrain <strong>system</strong>, are:<br />

• Ring soakaway<br />

• Horizontal tank soakaway<br />

• Trench soakaway<br />

• Infiltration trench<br />

•<br />

As part of a <strong>drainage</strong> blanket (increasing its storage capacity and<br />

reducing the volume of stone required)<br />

Please refer to <strong>Polypipe</strong> Stormwater Management Technical Manual for<br />

further information of SUDS and infiltration structure design.<br />

Ridgidrain Model Specification Clauses 1.7<br />

Ridgidrain ADS Filter / Carrier Drainage Pipes<br />

For applications subject to the<br />

Manual of Contract Documents for Highway<br />

Works in diameters up to 900mm<br />

The pipes shall be thermoplastic structured wall pipes and shall have<br />

a current British Board of Agrément Building Regulations or HAPAS<br />

certificate stating that they comply with volume 1, clause 518 of the<br />

00/R121, 00/3678 & 02/H068<br />

Manual of Contract Documents for Highway Works. The <strong>system</strong> shall be<br />

stored, handled, transported and installed in accordance with the Manual<br />

of Contract Documents for Highway Works. The pipes shall be of carrier /<br />

fully perforated / half perforated (solid invert) configuration. Solid CERTIFICATE invert<br />

No. 93/R078<br />

and carrier <strong>drainage</strong> pipe shall be installed with sealed joints. Diameters<br />

450mm and greater shall incorporate a factory fitted integral socket.<br />

The pipe shall have a blue inner wall to facilitate CCTV surveying.<br />

BBA BRITISH<br />

BOARD OF<br />

AGRÉMENT<br />

CERTIFICATE NUMBERS<br />

BBA BRITISH<br />

BOARD OF<br />

AGRÉMENT<br />

BBA BRITISH<br />

BOARD OF<br />

AGRÉMENT<br />

CERTIFICATE No. 02/3923<br />

BBA BRITISH<br />

BOARD OF<br />

AGRÉMENT<br />

CERTIFICATE No. 00/R121<br />

BBA BRITISH<br />

BOARD OF<br />

AGRÉMENT<br />

CERTIFICATE No. 90/R054<br />

BBA BRITISH<br />

BOARD OF<br />

AGRÉMENT<br />

CERTIFICATE No. 00/3678<br />

BBA BRITISH<br />

BOARD OF<br />

AGRÉMENT<br />

CERTIFICATE No. 00/R121 & 00/3678<br />

BBA BRITISH<br />

BOARD OF<br />

AGRÉMENT<br />

CERTIFICATE No. 03/3979<br />

BBA BRITISH<br />

BOARD OF<br />

AGRÉMENT<br />

CERTIFICATE No. 00/R1221<br />

BBA BRITISH<br />

BOARD OF<br />

AGRÉMENT<br />

CERTIFICATE No. 02/H068<br />

BBA BRITISH<br />

BOARD OF<br />

AGRÉMENT<br />

CERTIFICATE No. 00/R121 & 3678<br />

BBA BRITISH<br />

BOARD OF<br />

AGRÉMENT<br />

CERTIFICATE No. 00/R121 & 3678<br />