27.11.2014 Views

Locomotive Emissions Monitoring Program - Railway Association of ...

Locomotive Emissions Monitoring Program - Railway Association of ...

Locomotive Emissions Monitoring Program - Railway Association of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.2<br />

<strong>Locomotive</strong> Duty Cycle<br />

The duty cycle is an element <strong>of</strong> the daily locomotive utilization pr<strong>of</strong>ile. An explanation <strong>of</strong> what constitutes the<br />

<strong>Locomotive</strong> Utilization Pr<strong>of</strong>ile and where the duty cycle fits in the pr<strong>of</strong>ile is given in the Glossary <strong>of</strong> Terms. Duty<br />

cycles are determined by evaluating the time spent at each power notch level for a statistically significant sample <strong>of</strong><br />

locomotives. Shown in Table 8 below are duty cycle values as <strong>of</strong> when updated for the various freight services, that<br />

is, Class I mainline, road switching, yard switching, regional lines and short lines, plus intercity and commuter rail<br />

passenger services. Duty cycle updates <strong>of</strong> regional mainline freight and commuter services were done in 2008 while<br />

the most recent updates <strong>of</strong> other services were undertaken in 2007. Of note is that the percentage <strong>of</strong> time-at-idle<br />

<strong>of</strong> Class I mainline locomotives has reduced. This has been due primarily to the installation <strong>of</strong> automatic anti-idling<br />

devices and a strict manual shutdown policy. The increased use <strong>of</strong> such engine shutdown procedures has led to lower<br />

fuel consumption and emissions generated.<br />

Table 8<br />

Duty Cycle by <strong>Locomotive</strong> Service and Year <strong>of</strong> Update<br />

Per cent <strong>of</strong> Engine Operating Time<br />

2007 - 2008 Updates<br />

2001 Update<br />

1990 Update<br />

Idle N1 N2 N3 N4 N5 N6 N7 N8 DB<br />

2007 Class I Mainline Freight 51.3 4.7 5.7 4.7 3.8 3.2 3.0 1.6 14.0 8.0<br />

2007 Class I Road Switch 77.6 4.3 4.4 2.8 2.2 1.4 1.1 0.6 3.2 2.4<br />

2008 Regional Mainline Freight 67.4 8.3 4.9 4.1 3.5 2.0 2.0 1.6 6.2 0.0<br />

2007 Short Line (Assumed<br />

equivalent to Road Switching) 77.6 4.3 4.4 2.8 2.2 1.4 1.1 0.6 3.2 2.4<br />

2007 Yard Switching 84.9 5.4 4.2 2.2 1.4 0.6 0.3 0.2 0.6 0.2<br />

2007 Intercity Passenger 49.7 16.5 4.9 3.4 2.2 1.3 1.2 0.3 18.3 2.2<br />

2008 Commuter (Note 1) 61.4 2.3 2.2 2.1 1.3 1.2 1.8 24.0 3.7<br />

2001 Freight Class I 58.1 3.9 5.0 4.4 3.7 3.3 3.0 1.5 12.0 5.1<br />

2001 Freight Train 61.6 3.8 4.7 4.1 3.5 3.1 2.8 1.5 10.9 4.0<br />

2001 Passenger 69.5 0.5 4.8 2.1 1.4 1.2 0.8 0.2 19.5 0.0<br />

2001 Switching 83.0 4.1 4.0 3.6 2.0 1.0 0.5 0.3 1.5 0.0<br />

1990 Freight 60.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 12.0 0.0<br />

1990 Branch/Yard 81.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 5.0 0.0<br />

Note 1: 2008 Commuter – Idle and N1 are the same power notch position<br />

16 LEM 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!