Figure 10: EDISON grid stakeholder model 12<br />

In order to test the ICT system, an Edison Virtual Power Plant (EVPP) was developed. The server was<br />

implemented with a REST (Representational State Transfer)-based architecture enabling IEC 61850 to<br />

provide interoperability between partners within EDISON.<br />

Figure 11: EDISON’s REST enabled 61850 server setup 13<br />

12 EDISON consortium (2011): WP3 report D<strong>3.1</strong> of the EDISON project http://www.edisonnet.dk/Dissemination/Reports/D<strong>3.1</strong>.aspx,<br />

retrieved on 08.11.2011.<br />

GA MOVE/FP7/265499/<strong>Green</strong> <strong>eMotion</strong> WP 3: <strong>Deliverable</strong> <strong>3.1</strong> Page 32 of 147