Prime pagine RA2010FUS:Copia di Layout 1 - ENEA - Fusione
Prime pagine RA2010FUS:Copia di Layout 1 - ENEA - Fusione
Prime pagine RA2010FUS:Copia di Layout 1 - ENEA - Fusione
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
012<br />
progress report<br />
2010<br />
Table 1.I – Summary of FTU operations in 2010<br />
Jan. Feb. March April May June July Total<br />
Total pulses (p) 11 0 0 22 0 283 33 349<br />
Successful pulses (sp) 9 0 0 19 0 262 30 320<br />
I(sp) 0.82 0.86 0.93 0.91 0.92<br />
Potential experimental days 3.5 0.0 3.5 0.0 10.0 6.0 23.0<br />
Real experimental days 0.5 0.0 1.0 0.0 10.0 1.0 12.5<br />
I(ed) 0.14 0.29 1.00 0.17 0.54<br />
Experimental minutes 134 0 287 0 4476 500 5397<br />
Delay minutes 119 0 345 0 1735 155 2354<br />
I(et) 0.53 0.45 0.72 0.76 0.70<br />
A(sp/d) 18.00 19.00 26.20 30.00 25.60<br />
A(p/d) 22.00 22.00 28.30 33.00 27.92<br />
Delay per system (minutes)<br />
Jan. Feb. MarchApril May June July Total %<br />
Machine 94 0 0 12 0 339 42 487 20.7<br />
Power supplies 10 0 0 83 0 599 33 725 30.8<br />
Ra<strong>di</strong>ofrequency 0 0 0 0 0 0 0 0 0.0<br />
Control system 0 0 0 0 0 108 0 108 4.6<br />
DAS 0 0 0 0 0 44 0 44 1.9<br />
Feedback 0 0 0 0 0 84 0 84 3.6<br />
Network 0 0 0 0 0 0 0 0 0.0<br />
Diagnostic systems 0 0 0 39 0 115 30 184 7.8<br />
Analysis 12 0 0 0 0 283 50 345 14.7<br />
Others 3 0 0 211 0 163 0 377 16.0<br />
TOTAL 119 0 0 345 0 1735 155 2354 100<br />
An upgrade of the present FTU feedback control system was started, also envisaging a possible reutilization<br />
in the proposed FAST experiment. A pre–existent framework called multithreaded application real–time<br />
executor (MARTe), already successfully used in other European tokamak devices, was adopted. MARTe has<br />
been integrated in the current control structure and pulse programming interface, thus provi<strong>di</strong>ng a common<br />
environment with other MARTe systems already running in FTU, such as the real time version of the plasma<br />
equilibrium reconstruction RT–ODIN and the satellite station that minimizes the LH reflected power.<br />
50<br />
40<br />
30<br />
20<br />
10<br />
0<br />
Figure 1.2 – 2010 ITM–TF users grouped by country<br />
F D I UK FINCH PL P S EU A CZ GR NL B DK RO CY E H IRLRUSLO US NaN<br />
ITM Task Force Gateway. The<br />
Gateway operations have continued to<br />
provide the full scale support to<br />
Integrated Tokamak Modelling–Task<br />
Force (ITM–TF) users, thus allowing<br />
them to develop ITM software and<br />
data access facilities. It has been<br />
carried out by means of the Gateway<br />
trouble ticket system and <strong>di</strong>rect<br />
support by email.<br />
A number of 223 ITM–TF users have<br />
got an account onto the Gateway in<br />
2010 as depicted in figure 1.2. The<br />
development & testing activity of the<br />
ITM–TF users is reported as CPUs