25.12.2014 Views

Prime pagine RA2010FUS:Copia di Layout 1 - ENEA - Fusione

Prime pagine RA2010FUS:Copia di Layout 1 - ENEA - Fusione

Prime pagine RA2010FUS:Copia di Layout 1 - ENEA - Fusione

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

012<br />

progress report<br />

2010<br />

Table 1.I – Summary of FTU operations in 2010<br />

Jan. Feb. March April May June July Total<br />

Total pulses (p) 11 0 0 22 0 283 33 349<br />

Successful pulses (sp) 9 0 0 19 0 262 30 320<br />

I(sp) 0.82 0.86 0.93 0.91 0.92<br />

Potential experimental days 3.5 0.0 3.5 0.0 10.0 6.0 23.0<br />

Real experimental days 0.5 0.0 1.0 0.0 10.0 1.0 12.5<br />

I(ed) 0.14 0.29 1.00 0.17 0.54<br />

Experimental minutes 134 0 287 0 4476 500 5397<br />

Delay minutes 119 0 345 0 1735 155 2354<br />

I(et) 0.53 0.45 0.72 0.76 0.70<br />

A(sp/d) 18.00 19.00 26.20 30.00 25.60<br />

A(p/d) 22.00 22.00 28.30 33.00 27.92<br />

Delay per system (minutes)<br />

Jan. Feb. MarchApril May June July Total %<br />

Machine 94 0 0 12 0 339 42 487 20.7<br />

Power supplies 10 0 0 83 0 599 33 725 30.8<br />

Ra<strong>di</strong>ofrequency 0 0 0 0 0 0 0 0 0.0<br />

Control system 0 0 0 0 0 108 0 108 4.6<br />

DAS 0 0 0 0 0 44 0 44 1.9<br />

Feedback 0 0 0 0 0 84 0 84 3.6<br />

Network 0 0 0 0 0 0 0 0 0.0<br />

Diagnostic systems 0 0 0 39 0 115 30 184 7.8<br />

Analysis 12 0 0 0 0 283 50 345 14.7<br />

Others 3 0 0 211 0 163 0 377 16.0<br />

TOTAL 119 0 0 345 0 1735 155 2354 100<br />

An upgrade of the present FTU feedback control system was started, also envisaging a possible reutilization<br />

in the proposed FAST experiment. A pre–existent framework called multithreaded application real–time<br />

executor (MARTe), already successfully used in other European tokamak devices, was adopted. MARTe has<br />

been integrated in the current control structure and pulse programming interface, thus provi<strong>di</strong>ng a common<br />

environment with other MARTe systems already running in FTU, such as the real time version of the plasma<br />

equilibrium reconstruction RT–ODIN and the satellite station that minimizes the LH reflected power.<br />

50<br />

40<br />

30<br />

20<br />

10<br />

0<br />

Figure 1.2 – 2010 ITM–TF users grouped by country<br />

F D I UK FINCH PL P S EU A CZ GR NL B DK RO CY E H IRLRUSLO US NaN<br />

ITM Task Force Gateway. The<br />

Gateway operations have continued to<br />

provide the full scale support to<br />

Integrated Tokamak Modelling–Task<br />

Force (ITM–TF) users, thus allowing<br />

them to develop ITM software and<br />

data access facilities. It has been<br />

carried out by means of the Gateway<br />

trouble ticket system and <strong>di</strong>rect<br />

support by email.<br />

A number of 223 ITM–TF users have<br />

got an account onto the Gateway in<br />

2010 as depicted in figure 1.2. The<br />

development & testing activity of the<br />

ITM–TF users is reported as CPUs

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!