060<br />

progress report<br />

2010<br />

Figure 3.8 – Details of the structural FEM of the <strong>di</strong>vertor system: CB with locking<br />

system, dome and VT<br />

3.2 Breeder Blanket and Fuel Cycle<br />

European Bree<strong>di</strong>ng Blanket Test Facility design and construction<br />

The European Bree<strong>di</strong>ng Blanket Test Facility (EBBTF) is the reference European facility for the qualification<br />

of test blanket modules (TBMs). It is constituted by the Integrated European Lead Lithium LOop (IELLLO)<br />

and the HElio for FUSion loop (HEFUS 3).<br />

In 2009 the lead lithium to fill the loop and complete the commissioning was received in <strong>ENEA</strong> Brasimone.<br />

The acceptance procedure took a long time due to large <strong>di</strong>fferences in the lithium content, and the procedure<br />

was concluded in November. The loop was filled in February 2010. The new HEFUS 3 circulator was<br />

delivered in <strong>ENEA</strong> Brasimone in the first weeks of 2010 and the installation completed in the first semester<br />

of 2010.<br />

TRIEX loop for studying technologies of tritium extraction from<br />

Pb–17Li<br />

The main objective to be achieved in the TRItium EXtraction (TRIEX)<br />

facility is to verify the efficiency of the hydrogen extraction system from<br />

the liquid metal loop in the range of operating con<strong>di</strong>tions of the European<br />

TBM (fig. 3.9).<br />

In order to carry out the tests, in 2010 the mechanical pump was requalified<br />

and inserted into the TRIEX loop. In April the pump was not<br />

characterized in lead lithium due to the mechanical pump failure after 12h<br />

of work. On the basis of this experience, an upgra<strong>di</strong>ng of the TRIEX loop<br />

was planned and a new pump was selected. The new loop is expected to<br />

start in November 2011.<br />

Figure 3.9 – TRIEX loop<br />

Electromagnetic load analysis for the design of the blanket manifold pipe<br />

concept for ITER<br />

<strong>ENEA</strong> completed the activities related to the 3D EM load analysis of the new manifold concept (NMC) for<br />

the ITER blanket and shield system, accor<strong>di</strong>ng to the EFDA Contract 07–1702/1620 (TW6–TVB–MANEM)<br />

[3.2]. The activities were performed with the support of L.T. Calcoli company.