06.11.2012 Views

0870 849 8057 USERS G 24, 30 - Ideal Heating

0870 849 8057 USERS G 24, 30 - Ideal Heating

0870 849 8057 USERS G 24, 30 - Ideal Heating

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INsTaLLaTION<br />

22<br />

1. INTERNaL TO sINK WasTE<br />

UpsTREaM OF sINK WasTE TRap<br />

INsTaLLaTION<br />

22 CONDENsaTE pIpE TERMINaTION CONFIgURaTIONs<br />

notes: all exTernal pipe runs MusT be in accorDance WiTh bs 6798<br />

3. INTERNaL CONNECTION TO sOIL aND VENT sTaCK<br />

* Make connection to SVP using a solvent welded saddle<br />

4. TERMINaTION TO sOaK aWay 5. TERMINaTION TO DRaIN / gULLy<br />

BOILER<br />

cla7774<br />

External<br />

wall<br />

minimum<br />

500mm<br />

BOILER<br />

cla7771a<br />

Termination<br />

to Soak away<br />

BOILER<br />

esp8882<br />

Ground Level<br />

BOILER<br />

cla7775<br />

External<br />

wall<br />

DRAIN<br />

DRAIN<br />

Open end of pipe<br />

direct into gulley<br />

below grating but<br />

above water level<br />

Ground Level<br />

Open end of pipe<br />

direct into gulley<br />

below grating but<br />

above water level<br />

Ground Level<br />

i-mini - Installation and Servicing

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!