0870 849 8057 USERS G 24, 30 - Ideal Heating
0870 849 8057 USERS G 24, 30 - Ideal Heating
0870 849 8057 USERS G 24, 30 - Ideal Heating
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
sERVICINg<br />
48<br />
66 pUMp hEaD REpLaCEMENT<br />
1. Refer to Frame 45.<br />
2. Drain the boiler. Refer to Frame 59.<br />
3. Disconnect the electrical lead from the pump.<br />
4. Remove the 4 Allen screws retaining the pump head.<br />
5. Remove the pump head.<br />
6. Fit the new pump head.<br />
7. Reassemble in reverse order.<br />
8. Refill the boiler.<br />
9. Check operation of the boiler. Refer to Frames 34 & 35.<br />
sERVICINg<br />
67 Ch WaTER pREssURE sENsOR REpLaCEMENT<br />
1. Refer to Frame 45.<br />
2. Drain the boiler. Refer to frame 59.<br />
3. Remove condensate trap/siphon. Refer to<br />
Frame 55.<br />
4. Using a suitable tool pull out the retaining<br />
clip.<br />
5. Pull the pressure sensor upwards to<br />
remove.<br />
6. Unplug the electrical connection and<br />
transfer to the new pressure sensor.<br />
7. Push the new pressure sensor onto the<br />
rear pump housing and fit retaining clip.<br />
8. Reassemble in reverse order.<br />
9. Refill the boiler.<br />
10. Check Operation of the boiler. Refer to<br />
Frames 34 & 35.<br />
4<br />
68 DhW FILTER & DhW FLOW REgULaTOR CLEaNINg / REpLaCEMENT<br />
DhW Filter<br />
1. Refer to Frame 45.<br />
2. Isolate the mains cold water supply to the boiler.<br />
3. Drain the boiler DHW circuit. Refer to frame 59.<br />
4. Remove DHW flow turbine cartridge. Refer to Frame 63.<br />
5. Unscrew the flow regulator housing.<br />
6. Remove the filter.<br />
7. Clean or replace filter as necessary.<br />
8. Reassemble in reverse order.<br />
9. Refill the boiler.<br />
10. Check Operation of the boiler. Refer to Frames 34 & 35.<br />
5<br />
6<br />
4<br />
3<br />
5<br />
6<br />
DhW Flow Regulator<br />
1. Refer to Frame 45.<br />
2. Isolate the mains cold water supply to the boiler.<br />
3. Drain the boiler DHW circuit. Refer to Frame 59.<br />
4. Remove DHW flow turbine cartridge. Refer to Frame 63.<br />
5. Unscrew the flow regulator housing.<br />
6. Inspect the flow regulator for any blockage and remove if<br />
necessary.<br />
7. Reassemble in reverse order.<br />
8. Refill the boiler.<br />
9. Check Operation of the boiler. Refer to Frames 34 & 35.<br />
i-mini - Installation and Servicing