06.11.2012 Views

0870 849 8057 USERS G 24, 30 - Ideal Heating

0870 849 8057 USERS G 24, 30 - Ideal Heating

0870 849 8057 USERS G 24, 30 - Ideal Heating

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

sERVICINg<br />

48<br />

66 pUMp hEaD REpLaCEMENT<br />

1. Refer to Frame 45.<br />

2. Drain the boiler. Refer to Frame 59.<br />

3. Disconnect the electrical lead from the pump.<br />

4. Remove the 4 Allen screws retaining the pump head.<br />

5. Remove the pump head.<br />

6. Fit the new pump head.<br />

7. Reassemble in reverse order.<br />

8. Refill the boiler.<br />

9. Check operation of the boiler. Refer to Frames 34 & 35.<br />

sERVICINg<br />

67 Ch WaTER pREssURE sENsOR REpLaCEMENT<br />

1. Refer to Frame 45.<br />

2. Drain the boiler. Refer to frame 59.<br />

3. Remove condensate trap/siphon. Refer to<br />

Frame 55.<br />

4. Using a suitable tool pull out the retaining<br />

clip.<br />

5. Pull the pressure sensor upwards to<br />

remove.<br />

6. Unplug the electrical connection and<br />

transfer to the new pressure sensor.<br />

7. Push the new pressure sensor onto the<br />

rear pump housing and fit retaining clip.<br />

8. Reassemble in reverse order.<br />

9. Refill the boiler.<br />

10. Check Operation of the boiler. Refer to<br />

Frames 34 & 35.<br />

4<br />

68 DhW FILTER & DhW FLOW REgULaTOR CLEaNINg / REpLaCEMENT<br />

DhW Filter<br />

1. Refer to Frame 45.<br />

2. Isolate the mains cold water supply to the boiler.<br />

3. Drain the boiler DHW circuit. Refer to frame 59.<br />

4. Remove DHW flow turbine cartridge. Refer to Frame 63.<br />

5. Unscrew the flow regulator housing.<br />

6. Remove the filter.<br />

7. Clean or replace filter as necessary.<br />

8. Reassemble in reverse order.<br />

9. Refill the boiler.<br />

10. Check Operation of the boiler. Refer to Frames 34 & 35.<br />

5<br />

6<br />

4<br />

3<br />

5<br />

6<br />

DhW Flow Regulator<br />

1. Refer to Frame 45.<br />

2. Isolate the mains cold water supply to the boiler.<br />

3. Drain the boiler DHW circuit. Refer to Frame 59.<br />

4. Remove DHW flow turbine cartridge. Refer to Frame 63.<br />

5. Unscrew the flow regulator housing.<br />

6. Inspect the flow regulator for any blockage and remove if<br />

necessary.<br />

7. Reassemble in reverse order.<br />

8. Refill the boiler.<br />

9. Check Operation of the boiler. Refer to Frames 34 & 35.<br />

i-mini - Installation and Servicing

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!