06.11.2012 Views

0870 849 8057 USERS G 24, 30 - Ideal Heating

0870 849 8057 USERS G 24, 30 - Ideal Heating

0870 849 8057 USERS G 24, 30 - Ideal Heating

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INsTaLLaTION<br />

33 COMMIssIONINg aND TEsTINg<br />

<strong>30</strong><br />

a. Electrical Installation<br />

1. Checks to ensure electrical safety should be carried out by a<br />

competent person.<br />

2. ALWAYS carry out the preliminary electrical system checks,<br />

i.e. earth continuity, polarity, resistance to earth and short<br />

circuit, using a suitable test meter.<br />

INsTaLLaTION<br />

B. gas Installation<br />

1. The whole of the gas installation, including the meter,<br />

should be inspected and tested for tightness and purged in<br />

accordance with the recommendations of BS. 6891.<br />

In IE refer to IS.813:2002.<br />

2. Purge air from the gas installation by the approved methods<br />

only.<br />

Warning. Whilst effecting the required gas tightness test and purging air from the gas installation,<br />

open all windows and doors, extinguish naked lights and Do noT sMoKe.<br />

gENERaL<br />

please note: The combustion for this appliance has<br />

been checked, adjusted and preset at the factory for<br />

operation on the gas type defined on the appliance<br />

data plate. No measurement of the combustion is<br />

necessary. DO NOT adjust the air/gas ratio valve.<br />

Having checked:<br />

- That the boiler has been installed in accordance<br />

with these instructions.<br />

- The integrity of the flue system and the flue seals,<br />

as described in the Flue Installation section.<br />

Proceed to put the boiler into operation as follows:<br />

ChECK ThE OpERaTIONaL (WORKINg) gas<br />

INLET pREssURE<br />

CH Flow<br />

Set up the boiler to operate DHW atOutlet maximum rate by<br />

opening hot tap to maximum<br />

flow.<br />

Gas Supply<br />

With the boiler operating in<br />

the maximum rate condition<br />

check that the operational<br />

(working) gas pressure at<br />

the inlet gas pressure Blacktest<br />

point complies with Handle the<br />

requirements - refer to “Gas<br />

Yellow<br />

Supply” on page 8. Handle<br />

Ensure that this inlet pressure<br />

can be obtained with all other Gas Pressure<br />

gas appliances in the property Test Point<br />

working.<br />

DHW Inlet<br />

Blue<br />

Handle<br />

CH Return<br />

3G9927<br />

Black<br />

Handle<br />

Safety<br />

Drain<br />

Valve<br />

aTTENTION !<br />

IT Is a CONDITION OF ThE MaNUFaCTURERs WaRRaNTy ThaT ThE<br />

BENChMaRK COMMIssIONINg ChECKLIsT Is FULLy COMpLETED<br />

aND LEFT WITh ThE appLIaNCE<br />

i-mini - Installation and Servicing

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!