1.4 Chronology of<br />
major events in the<br />
<strong>HSE</strong> Group in 2008<br />
January<br />
• The Supervisory Board of <strong>HSE</strong> adopted the business<br />
plan of <strong>HSE</strong> for 2008.<br />
• At HPP Zlatoličje, DEM installed a new driver, around<br />
a 90-tonne component of the new turbine, which was<br />
by means of a special lift lowered to the lower part<br />
of the turbine 2 shaft. This installation is one of the<br />
most demanding and important renovation phases<br />
of this turbine in the largest Slovene HPP.<br />
• After concluding the contract to sell and purchase<br />
SEL’s interest in a joint venture, GEN energija joined<br />
the joint venture for HPP construction on the lower<br />
Sava River.<br />
• TEŠ started combusting wood biomass, which will<br />
contribute to the fulfilment of the EU requirements related<br />
to greenhouse gas emissions and the produced<br />
primary energy from renewable energy sources.<br />
• DEM and the Austrian company KELAG signed the<br />
Data Exchange Agreement referring to mutual energy<br />
impacts on account of an upgrade of the pumping<br />
unit for pumping water from the Drava River to the<br />
reservoir lake of HPP Golica in the Koroška region<br />
in Austria.<br />
February<br />
• The Supervisory Boards/General Meetings of subsidiaries<br />
adopted the business plans of DEM, SENG,<br />
TET, PV and <strong>HSE</strong> Invest for 2008.<br />
• At the end of February, the Minister of the Environment<br />
and Spatial Planning, Janez Podobnik, and his<br />
colleagues inspected the entire construction site next<br />
to the reservoir of HPP Blanca and the dam facility.<br />
• DEM selected the company <strong>HSE</strong> Invest as the lead<br />
designer and manager of construction investment<br />
engineering at PSP Kozjak and of the transmission<br />
line between the pumped storage plant and DTS<br />
Maribor.<br />
• Articles of Association were signed on the foundation<br />
of Hidroelektrarna na Spodnji Savi d.o.o. (HESS).<br />
• SENG obtained a partial building permit for the construction<br />
of the connecting transmission line and<br />
110 kV cable line for PSP Avče.<br />
March<br />
• Three contracts were signed with designers on the<br />
production of project and technical documentation<br />
for the NPP Krško reservoir.<br />
• The 11th Strategic Conference of the PV Group took<br />
place.<br />
25