TEŠ's Unit 6, 600 MW<br />
Considering the requirements for increasing electricity<br />
production due to ever greater consumption by end<br />
users, the existing units of TEŠ will be upgraded by<br />
additional production capacity – Unit 6 with projected<br />
power of 600 MW. Parallel to that, older units whose<br />
life span is nearing the end or which are technologically<br />
obsolete will be replaced.<br />
The importance of this project not only for the company<br />
but also for Slovenia is demonstrated by the fact that<br />
the project has been included in the National Development<br />
Project Resolution 2007–2023. Using 4 million<br />
tonnes of coal, TEŠ’s annual electricity output, which<br />
now amounts to 3,600 GWh, would increase to 4,700<br />
GWh if the project is implemented. The fact that the impact<br />
on the environment is reduced thanks to the improved<br />
efficiency of modern plants is also significant.<br />
The construction of Unit 6 is planned to be financed<br />
from several sources. In September 2007, an agreement<br />
was signed with the EIB on a long-term loan of<br />
€ 350 million.<br />
The Official Journal of the EU in March 2008 published<br />
a tender for supply of a flue gas desulphurisation device<br />
and in September 2008 a tender for the supply<br />
and installation of a 400 kV GIS switchyard. Tender<br />
documentation for the supply of a cooling water system<br />
is being prepared – construction and preparatory<br />
work – for the purpose of setting up the cooling tower<br />
and implementing other preparatory work. In June<br />
2008 an agreement was signed on the supply of the<br />
main technological equipment.<br />
The project investor is TEŠ.<br />
The main advantage of new technology is better utilisation<br />
of the energy source. Unit 6 will instead of 4 use<br />
3 million tonnes of lignite to produce the same quantity<br />
of electricity as generated by Units 1–5 in 2007.<br />
CO 2<br />
emissions per unit of energy produced will be reduced<br />
from 1.2 kg/kWh to 0.85 kg/kWh. Owing to even<br />
more efficient flue gas desulphurisation devices, SO 2<br />
emissions will be reduced by two thirds, amounting to<br />
less than 2,000 tonnes per year, whereas NO x<br />
emissions<br />
will equal no more than one fourth of the current<br />
figure, also not exceeding 2,000 tonnes per year.<br />
The consumption of process water will almost halve,<br />
resulting in smaller fluctuation of the water level in<br />
Družmir Lake. Noise levels in the environment will go<br />
down by as much as 70%. Moreover, less ash will be<br />
generated per unit of electricity produced.<br />
As the construction will be complex and extensive, it<br />
will be divided into several phases. The construction<br />
work is planned to start with the demolition of the<br />
cooling towers of Units 1–2 and 3 in 2010. Unit 6 is<br />
projected to start operating on a trial basis in 2014.<br />
Planned construction schedule:<br />
• 2009 – construction of the new telecommunications<br />
centre;<br />
• 2010 – demolition of cooling towers 1–2 and 3;<br />
• 2010 – start of Unit 6 construction;<br />
• 2012 – installation of equipment;<br />
• 2014 – trial operation;<br />
• 2015 – regular operation.<br />
Upgrade of TEŠ's<br />
Units 4 and 5<br />
The installation of two gas turbines at Units 4 and 5 increased<br />
the rated capacity of the units by a total of 84<br />
MW. The investment resulted in higher electricity production,<br />
while consuming the entire planned quantity<br />
of coal, and a lower CO 2<br />
emission factor per kWh.<br />
Work on the project to upgrade Units 4 and 5 through<br />
the installation of gas turbines progressed as planned.<br />