<strong>ANNUAL</strong> <strong>REPORT</strong> <strong>HSE</strong> | INTRODUCTION<br />

26<br />

• SENG acquired the building permit for the gravel<br />

barrier on the Soča River above HPP Doblar.<br />

April<br />

• On 4 April, DEM started the completely renovated<br />

driver of turbine 2 at HPP Zlatoličje for the first time.<br />

• Thorsten Diercks, Ph.D., Secretary General of the<br />

European Association for Coal and Lignite − Euracoal<br />

came to the Šalek Valley in early April for a twoday<br />

visit. He visited PV and TEŠ, and learned about<br />

the technological achievements and plans of both<br />

companies.<br />

• DEM was ranked second among the TOP 101 Slovene<br />

companies in 2007 based on two indicators:<br />

added value per employee and the operating profit/<br />

operating revenues ratio.<br />

• After replacing the hydro-mechanical and electrical<br />

equipment, SENG began trial operations at SHPP<br />

Jelenk.<br />

May<br />

• The Supervisory Board of <strong>HSE</strong> approved the Annual<br />

Report of the Company and the <strong>HSE</strong> Group for 2007.<br />

• The members of the <strong>HSE</strong> Supervisory Board appointed<br />

Viljem Pozeb, M.Sc., the then Assistant Director,<br />

new director of the company. Together with<br />

Jože Zagožen, Ph.D., he constitutes the <strong>HSE</strong> management.<br />

• DEM celebrated the 90th anniversary of HPP Fala.<br />

• TEŠ held a ceremonial opening of the first 42 MW<br />

gas turbine for producing electricity and introduced<br />

natural gas in addition to coal.<br />

• SENG signed a contract on BPP, PT and WEP documentation<br />

for the reconstruction of HPP Doblar 1,<br />

phase II.<br />

• The company TEŠ gained accreditation from the coal<br />

and desulphurisation testing laboratory.<br />

• PV created the Energy Office, tasked with constant care<br />

for rational and optimal use of energy in the PV Group.<br />

• TEŠ adopted the 2008 Business Plan.<br />

June<br />

• An annex was signed to the Concession Contract on<br />

utilisation of the energy potential of the lower Sava<br />

River, enabling the transfer of the concession right<br />

to HESS.<br />

• TEŠ signed a contract on the supply of main 600 MW<br />

technological equipment for Unit 6.<br />

• In co-operation with partners from the Pomurje region,<br />

DEM founded the Pomurje Development Institute<br />

(PRI), which is, in addition to expert tasks, also<br />

assigned an important role in bringing the project<br />

for constructing an HPP on the Mura River closer to<br />

the interested public.<br />

• After the reconstruction of HPP Ajba1 and successful<br />

initial trial start-up, SENG successfully passed<br />

the technical inspection.<br />

• <strong>HSE</strong> increased the capital of the subsidiary TEŠ to<br />

€ 15,794,000.<br />

• PV hosted the international workshop "Mine Greenhouse<br />

Gases CO 2<br />

and CH 4<br />

– Safety, Prevention, Management<br />

and Utilisation".<br />

• PV organised events on Miner's Day. At the 48th<br />

"Jump over the skin", 51 novices took on the mining<br />

profession and the honorary jumper was Uroš Rotnik,<br />

Ph.D., Managing director of TEŠ. Moreover, the<br />

best colleague and working group were announced.<br />

July<br />

• The subsidiary <strong>HSE</strong> Bratislava was established in<br />

Slovakia on 23 July 2008.<br />

• On 1 July 2008, the joint venture was transferred to<br />

the newly founded company HESS.<br />

• The General Meeting of <strong>HSE</strong> Invest re-appointed the<br />

current members of the Supervisory Board for another<br />

4-year term, as their term of office expired.<br />

August<br />

• PV witnessed a record daily progression entailing an<br />

8.5-metre G2/B excavation in the northern branch of<br />

the Preloge pit.<br />

• HESS became a concessionaire on the lower Sava<br />

River.<br />

• As the sole owner of DEM and TEŠ, <strong>HSE</strong> passed a<br />

resolution of the payment of accumulated profit in<br />

the amount of € 24 million for DEM and € 2.8 million<br />

for TEŠ.<br />

September<br />

• <strong>HSE</strong> drew a long-term loan from the EIB in the<br />

amount of € 74 million, granted for financing the<br />

investments in HPP Blanca and HPP Krško for the<br />

period of 20 years.<br />

• The company Hidro Moćnost Makedonija d.o.o., in<br />

which <strong>HSE</strong> holds a 33% stake, was founded in Skopje<br />

on 16 September 2008.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!