ous waste disposal site – to the northern disposal site<br />
and the start of the expansion of this disposal site due<br />
south. The 1st phase was completed, i.e. excavation at<br />
the disposal site, construction work, and drafting of a<br />
safety plan.<br />
Premogovnik Velenje<br />
The majority of funds were spent on excavation equipment,<br />
namely: excavation and directional chain conveyor,<br />
extraction machine, control excavation equipment,<br />
energy and other cables, and a high-pressure<br />
pumping site pump. Two diesel-powered rack-andpinion<br />
locomotives were purchased, in addition to<br />
two pneumatic shunting trains, tracks and transport<br />
units.<br />