ous waste disposal site – to the northern disposal site<br />

and the start of the expansion of this disposal site due<br />

south. The 1st phase was completed, i.e. excavation at<br />

the disposal site, construction work, and drafting of a<br />

safety plan.<br />

Premogovnik Velenje<br />

The majority of funds were spent on excavation equipment,<br />

namely: excavation and directional chain conveyor,<br />

extraction machine, control excavation equipment,<br />

energy and other cables, and a high-pressure<br />

pumping site pump. Two diesel-powered rack-andpinion<br />

locomotives were purchased, in addition to<br />

two pneumatic shunting trains, tracks and transport<br />

units.<br />