176<br />

million euros were invested by the end of 2008 in the HPP construction on the<br />

lower Sava River. Besides further additional electricity production of 721 GWh<br />

and the compliance with the EU guidelines, the project provides for better<br />

development of the local communities in the area of new hydro power plants,<br />

improved environmental protection and boosted regional development.<br />

2.9 Investments<br />

Electricity consumption has been constantly on the<br />

rise on the domestic and global level, which is why the<br />

<strong>HSE</strong> Group is seeking new, additional projects and investments<br />

to secure a safe, reliable, competitive and<br />

environmentally-friendly supply of electricity to Slovenia.<br />

Namely, the Group is aware that:<br />

• its customers depend on the quality of electricity;<br />

• in electricity production it is necessary to ensure<br />

optimal use of domestic sources, thus decreasing<br />

dependence on imports;<br />

• operations have to be expanded and active participation<br />

is needed on the common European and international<br />

market, while at the same time it is necessary<br />

to look for sources, also outside Slovenia, to<br />

compensate for the gap in the domestic supply;<br />

• great efficiency can only be achieved through efficient<br />

utilisation of primary sources, as a result of<br />

which the <strong>HSE</strong> Group constantly keeps up with the<br />

technological development and modernisation of its<br />

production facilities;<br />

• a high degree of supply reliability can only be achieved<br />

through appropriate diversification of sources;<br />

• new sources and know-how should be developed<br />

continuously.<br />

The investments of the <strong>HSE</strong> Group are aimed at modernising<br />

the existing thermal power plants and hydroelectrical<br />

capacities, and constructing new power<br />

facilities. Thus, the <strong>HSE</strong> Group pursues the following<br />

major objectives:<br />

• boosting the share of renewable energy sources;<br />

• applying new technologies in fossil fuel utilisation;<br />

• reducing greenhouse gas emissions;<br />

• increasing energy efficiency;<br />

• ensuring sustainable, environmentally-friendly use<br />

of sources; and<br />

• searching for and exploiting investments abroad.<br />

Below we present the major investments made by the<br />

<strong>HSE</strong> Group in 2008 in property, plant and equipment,<br />

and intangible assets.<br />

HPPs on the lower<br />

Sava River<br />

HPPs Boštanj, Blanca, Krško, Brežice and Mokrice<br />

will more than double the electricity production on<br />

the Sava River – a river with the least utilised energy<br />

potential. The electricity generated by the new power<br />

plants, which will be gradually constructed until 2015,<br />

will account for 21% of Slovene HPP production and is<br />

believed to cover 6% of the total electricity consumption<br />

of Slovenia.<br />

LETNO POROČILO <strong>HSE</strong> | NALOŽBE<br />

In addition to 189 MW of additional installed power<br />

and 721 GWh of extra annual production, better development<br />

of the local communities in the area of the<br />

new HPPs, improved environmental protection and<br />

boosted regional development are enabled.<br />

HPP Boštanj<br />

The threshold power of HPP Boštanj is 34 MW and its<br />

mean annual production is 115 GWh. The HPP is in<br />

58