176<br />
million euros were invested by the end of 2008 in the HPP construction on the<br />
lower Sava River. Besides further additional electricity production of 721 GWh<br />
and the compliance with the EU guidelines, the project provides for better<br />
development of the local communities in the area of new hydro power plants,<br />
improved environmental protection and boosted regional development.<br />
2.9 Investments<br />
Electricity consumption has been constantly on the<br />
rise on the domestic and global level, which is why the<br />
<strong>HSE</strong> Group is seeking new, additional projects and investments<br />
to secure a safe, reliable, competitive and<br />
environmentally-friendly supply of electricity to Slovenia.<br />
Namely, the Group is aware that:<br />
• its customers depend on the quality of electricity;<br />
• in electricity production it is necessary to ensure<br />
optimal use of domestic sources, thus decreasing<br />
dependence on imports;<br />
• operations have to be expanded and active participation<br />
is needed on the common European and international<br />
market, while at the same time it is necessary<br />
to look for sources, also outside Slovenia, to<br />
compensate for the gap in the domestic supply;<br />
• great efficiency can only be achieved through efficient<br />
utilisation of primary sources, as a result of<br />
which the <strong>HSE</strong> Group constantly keeps up with the<br />
technological development and modernisation of its<br />
production facilities;<br />
• a high degree of supply reliability can only be achieved<br />
through appropriate diversification of sources;<br />
• new sources and know-how should be developed<br />
continuously.<br />
The investments of the <strong>HSE</strong> Group are aimed at modernising<br />
the existing thermal power plants and hydroelectrical<br />
capacities, and constructing new power<br />
facilities. Thus, the <strong>HSE</strong> Group pursues the following<br />
major objectives:<br />
• boosting the share of renewable energy sources;<br />
• applying new technologies in fossil fuel utilisation;<br />
• reducing greenhouse gas emissions;<br />
• increasing energy efficiency;<br />
• ensuring sustainable, environmentally-friendly use<br />
of sources; and<br />
• searching for and exploiting investments abroad.<br />
Below we present the major investments made by the<br />
<strong>HSE</strong> Group in 2008 in property, plant and equipment,<br />
and intangible assets.<br />
HPPs on the lower<br />
Sava River<br />
HPPs Boštanj, Blanca, Krško, Brežice and Mokrice<br />
will more than double the electricity production on<br />
the Sava River – a river with the least utilised energy<br />
potential. The electricity generated by the new power<br />
plants, which will be gradually constructed until 2015,<br />
will account for 21% of Slovene HPP production and is<br />
believed to cover 6% of the total electricity consumption<br />
of Slovenia.<br />
LETNO POROČILO <strong>HSE</strong> | NALOŽBE<br />
In addition to 189 MW of additional installed power<br />
and 721 GWh of extra annual production, better development<br />
of the local communities in the area of the<br />
new HPPs, improved environmental protection and<br />
boosted regional development are enabled.<br />
HPP Boštanj<br />
The threshold power of HPP Boštanj is 34 MW and its<br />
mean annual production is 115 GWh. The HPP is in<br />