trial operation, during which the equipment is being<br />

monitored.<br />

HPP Blanca<br />

HPP Blanca witnessed the following significant events<br />

in 2008:<br />

• construction work on the dam facility was finalised;<br />

• the Sava River was redirected to the spillways;<br />

• the internal technical inspection for elevating the<br />

reservoir to an intermediate level was successfully<br />

conducted;<br />

• turbine 1 was installed and synchronised, and is<br />

ready for a trial run;<br />

• installation of electrical and other equipment at the<br />

HPP was carried out; and<br />

• the 110 kV cable line was connected and hooked up.<br />

In 2009 HPP Blanca will be put into trial operation.<br />

HPP Krško<br />

The following major events took place at HPP Krško<br />

in 2008:<br />

• preparatory work was completed to protect the 1st<br />

construction pit;<br />

• a bridge was constructed downstream from the HPP;<br />

• the spillways were concreted;<br />

• the installation and concreting of guides for hydromechanical<br />

spillway equipment commenced;<br />

• the Agreement on By-Pass Financing was signed;<br />

• the Protocol and Agreement on road deviation at<br />

HPP Krško were concluded.<br />

HPP Brežice and HPP Mokrice<br />

At HPP Brežice and HPP Mokrice, the following important<br />

events took place in 2008:<br />

• the procedure and preparation of national spatial<br />

development plans were carried out (NSP);<br />

• expert bases were produced for the NSP;<br />

• technical and spatial documentation was prepared.<br />

Project investors are <strong>HSE</strong>, DEM, SENG, TEB and GEN<br />

energija, financing the HPP construction on the lower<br />

Sava River in proportion to their equity stakes in HESS<br />

and in line with the investment payment plans. In September<br />

2008, <strong>HSE</strong> drew a long-term loan from the EIB<br />

in the amount of € 74 million for financing the investments<br />

in HPP Blanca and HPP Krško.<br />

PSP Avče<br />

PSP Avče will be the first pumped storage hydro power<br />

plant, contributing to the higher production of peak<br />

electricity required by the Slovene energy system, and<br />

the existing production capacity of SENG and <strong>HSE</strong>. In<br />

addition to the above advantages, PSP Avče plays an<br />

important role in the regional and urban development<br />

of the area, and in ensuring higher employment rates in<br />

the economic sector, promoting the economic development<br />

of the area, and developing the Banjšice Plateau<br />

through the promotion of tourism at Kanalski Vrh.<br />

In periods of low electricity prices (at night and on<br />

weekends), the PSP uses electricity to pump water<br />

to the reservoir, whereas in periods of high electricity<br />

prices (work-day peaks), the accumulated water<br />

is used for electricity production. The investment in<br />

this plant has been under way since 2003. The facility’s<br />

construction started when the building permit<br />

was obtained in September 2004. The developments<br />

on site commenced in December 2004.<br />

Technical data of PSP Avče:<br />

maximum gross head:<br />

Hb = 521.00 m<br />

useful water volume: Vk = 2,170,000 m 3<br />

rated flow (turbine regime): Qi = 40 m 3 /s<br />

rated flow (pumping regime): Qč = 34 m 3 /s<br />

rated turbine power:<br />

Pi = 185 MW<br />

rated pumping capacity:<br />

Pč = 180 MW<br />

annual electricity production: El = 426 GWh<br />

annual energy consumption for pumping: Eč = 553 GWh<br />

In 2008 the following important events took place at<br />

PSP Avče:<br />

• the upper reservoir and the intake facility were constructed,<br />

work was carried out on the reflective and<br />

protective barrier next to the reservoir, and work involving<br />

landscaping of areas, biotope and info point<br />

facility construction commenced;<br />

LETNO POROČILO <strong>HSE</strong> | NASLOV POGLAVJA<br />

59