2.8 Purchasing and<br />

suppliers<br />

2.8.1 Electricity<br />

Synergy<br />

To maximise efficiency, <strong>HSE</strong> seeks to take advantage of<br />

synergies associated with a wide spectrum of production<br />

units within the Group. Because different production<br />

units have different operational and cost characteristics,<br />

a more cost-effective electricity production<br />

can be achieved through an appropriate combination of<br />

production schedules. And because electricity market<br />

prices fluctuate over time, the economical dispatching<br />

of production units, while observing technical criteria,<br />

is all the more important.<br />

<strong>HSE</strong> Group’s electricity production units in 2008<br />

DEM Dravograd Vuzenica Vuhred Ožbalt Fala MB otok Zlatoličje Zlatoličje Formin Small HE TOTAL<br />

Period Jan-Jun Jul-Dec<br />

Turbines 3 3 3 3 1+2 3 2+1 2+1 2 1<br />

Net output MW 26 56 72 73 58 60 114 120 116 0.7 576 / 582<br />

Rated<br />

generation MVA 36 78 90 90 74 78 148 159 148 0.9 743 / 754<br />

capacity<br />

Gross head m 8.9 13.7 17.4 17.4 14.6 14.2 33 33 29 105<br />

Rated<br />

flow Qi<br />

m 3 /s 405 550 550 550 505 550 463 463 500<br />

HESS Boštanj TOTAL<br />

Turbines 3<br />

Net output MW 34 34<br />

Rated generation capacity MVA 43,5 43,5<br />

Gross head m 7.6 7.6<br />

Rated flow Qi m 3 /s 500<br />

SENG Doblar I. Doblar II. Plave I. Plave II. Solkan Zadlaščica Small HE TOTAL<br />

Turbines 3 1 2 1 3 2 26<br />

Net output MW 30 40 15 19 32 8 11.4 155.4<br />

Rated generation capacity MVA 48 50 22 23 39 10 15.6 207.6<br />

Gross head m 47.2 48.5 27.5 27.5 23 173.7<br />

Rated flow Qi m 3 /s 90 105 75 105 180 2.2<br />

TEŠ GT 51 GT 52 Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 TOTAL<br />

Period Apr-Dec Sep-Dec Jan-Oct<br />

Net output MW 42 42 25 25 55 248 305 658 / 700 / 742 / 717<br />

Rated generation capacity MVA 56.25 56.25 37.5 37.5 94 324 377 870 / 926 / 982 / 945<br />

TEŠ's Units 1 and 2: Available capacity was reduced to 25 MW due to wear of units.<br />

TEŠ's Unit 5: Generator output is 377 MVA at 3 bars of hydrogen pressure.<br />

TEŠ's Unit 2: No longer operational/used as a non-spinning reserve since 17/10/2008.<br />

TET GU I. GU II. Unit 4 TOTAL<br />

Net output MW 29 29 110 168<br />

Rated generation capacity MVA 34 34 156 224<br />

<strong>ANNUAL</strong> <strong>REPORT</strong> <strong>HSE</strong> | BUSINESS <strong>REPORT</strong><br />