14.01.2015 Views

October 2009 - South Tahoe Public Utility District

October 2009 - South Tahoe Public Utility District

October 2009 - South Tahoe Public Utility District

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

11.5.2 Project Considerations<br />

Similar to Project No. 17 (page 11-84) project considerations for this project involve the<br />

likelihood of an uncontrolled release from Harvey Place Reservoir. The 1997 flood event<br />

created operational problems for the <strong>District</strong> that required a variance from the Lahontan<br />

Regional Water Quality Control Board for release of recycled water from Harvey Place<br />

Reservoir. Project implementation is a question of the likelihood of catastrophic flood events<br />

and the <strong>District</strong>‟s desire to increase its operational flexibility.<br />

<strong>South</strong> <strong>Tahoe</strong> <strong>Public</strong> <strong>Utility</strong> <strong>District</strong><br />

Recycled Water Facilities Master Plan - <strong>October</strong> <strong>2009</strong> Page 11-86

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!