14.01.2015 Views

October 2009 - South Tahoe Public Utility District

October 2009 - South Tahoe Public Utility District

October 2009 - South Tahoe Public Utility District

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Executive Summary<br />

Introduction, Purpose and Objectives<br />

The <strong>South</strong> <strong>Tahoe</strong> <strong>Public</strong> <strong>Utility</strong> <strong>District</strong> (<strong>District</strong>) has prepared this Recycled Water Facilities<br />

Master Plan (Master Plan) for their recycled water and freshwater operations in Alpine County,<br />

California. The <strong>District</strong> also prepared an associated Environmental Impact Report (EIR) in<br />

accordance with the requirements of the California Environmental Quality Act (CEQA).<br />

The purpose of the Master Plan is to identify infrastructure and management projects to assure<br />

continued successful operation of the <strong>District</strong>‟s recycled water and freshwater systems in Alpine<br />

County.<br />

The <strong>District</strong> treats wastewater generated in the Lake <strong>Tahoe</strong> basin and exports the treated<br />

wastewater (recycled water) to Alpine County where it has been used to irrigate ranch lands<br />

since the 1960‟s. The <strong>District</strong> also operates a freshwater system in support of Indian Creek<br />

Reservoir, a recreational amenity in Alpine County that was formerly used for recycled water<br />

and which has since been converted to a freshwater reservoir.<br />

The objectives of the Master Plan include the following.<br />

1) Establishing a plan for recycled water and freshwater management for operation through<br />

the year 2028.<br />

2) Assuring regulatory compliance of the <strong>District</strong>‟s recycled water and freshwater<br />

operations.<br />

3) Protecting and enhancing the environment in Alpine County.<br />

4) Continuing cooperation with Alpine County stakeholders.<br />

Background<br />

In 1967 the <strong>South</strong> <strong>Tahoe</strong> <strong>Public</strong> <strong>Utility</strong> <strong>District</strong> (<strong>District</strong>) entered into an agreement with the<br />

Alpine County Water Agency for importation, storage and direct land application of recycled<br />

water in response to the Porter Cologne Act which, among other things prohibited the use of<br />

recycled water within the <strong>Tahoe</strong> Basin.<br />

Infrastructure was constructed to convey recycled water from the <strong>District</strong>‟s wastewater treatment<br />

plant out of the Lake <strong>Tahoe</strong> basin along Highway 89 over Luther Pass to Highway 88 in Hope<br />

Valley, then along the West Fork of the Carson River and eventually to the Indian Creek<br />

Reservoir, which was originally built for recycled water storage. The <strong>District</strong> entered into<br />

agreements with ranch owners in Alpine County to receive the recycled water for their use in<br />

irrigating their ranch lands.<br />

<strong>South</strong> <strong>Tahoe</strong> <strong>Public</strong> <strong>Utility</strong> <strong>District</strong><br />

Recycled Water Facilities Master Plan - <strong>October</strong> <strong>2009</strong><br />

Page xi

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!