Through a process of public participation and comment, along with comparison to the <strong>District</strong>‟s<br />

guiding principles (as discussed in Section 7, page 7-49), twenty-six distinct Master Plan<br />

projects were identified which reflect the most desirable aspects of all alternatives considered.<br />

The twenty-six projects include infrastructure and management projects for both recycled water<br />

and freshwater operations in Alpine County. Of the twenty-six projects, eight are recommended<br />

for implementation in the near future (five to eight years), the implementation of twelve other<br />

projects is contingent on various factors discussed in the Master Plan, the remaining six are<br />

future projects that will require additional CEQA documentation if they are to be implemented.<br />

The Master Plan projects, including a description, the project type, the recommendation status,<br />

the conceptual cost, and the Master Plan page number of the description of the project, are<br />

presented in Table ES-1. Costs for management projects and future projects were not<br />

developed.<br />

<strong>South</strong> <strong>Tahoe</strong> <strong>Public</strong> <strong>Utility</strong> <strong>District</strong><br />

Recycled Water Facilities Master Plan - <strong>October</strong> <strong>2009</strong><br />

Page xiii