Through a process of public participation and comment, along with comparison to the <strong>District</strong>‟s<br />
guiding principles (as discussed in Section 7, page 7-49), twenty-six distinct Master Plan<br />
projects were identified which reflect the most desirable aspects of all alternatives considered.<br />
The twenty-six projects include infrastructure and management projects for both recycled water<br />
and freshwater operations in Alpine County. Of the twenty-six projects, eight are recommended<br />
for implementation in the near future (five to eight years), the implementation of twelve other<br />
projects is contingent on various factors discussed in the Master Plan, the remaining six are<br />
future projects that will require additional CEQA documentation if they are to be implemented.<br />
The Master Plan projects, including a description, the project type, the recommendation status,<br />
the conceptual cost, and the Master Plan page number of the description of the project, are<br />
presented in Table ES-1. Costs for management projects and future projects were not<br />
developed.<br />
<strong>South</strong> <strong>Tahoe</strong> <strong>Public</strong> <strong>Utility</strong> <strong>District</strong><br />
Recycled Water Facilities Master Plan - <strong>October</strong> <strong>2009</strong><br />