4 to 6 years depending upon the species and growth characteristics. The revenue<br />

generation is generally minimal; however, the option would be leased and require<br />

minimal involvement by the <strong>District</strong>. A portion of the Diamond Valley Ranch not used for<br />

the irrigation fields would be a suitable site for growing bio-mass crops.<br />

(2) Wetland Sod and Seed Production<br />

By implementing this variation, the <strong>District</strong> would generate revenue from the production<br />

and sale of wetland sod and seed. Recycled water would be used to grow wetlandspecies<br />

sod for transplantation to mitigation sites. Seeds would also be harvested from<br />

mature wetlands and sold for wetland habitat projects. The Master Plan recommended<br />

irrigation fields on the Diamond Valley Ranch or some other location within the Diamond<br />

Valley Ranch would be suitable for producing wetland sod.<br />

(3) Mitigation Wetland Creation Using Freshwater<br />

Mitigation is required when waters of the State or wetlands of the United States are<br />

impacted. Under this variation, the <strong>District</strong> would create a mitigation wetland that would<br />

be used to “bank credits” in anticipation of selling the credits to others when waters or<br />

wetlands are impacted. The creation of mitigation wetlands would require <strong>District</strong><br />

support in perpetuity. Concern exists by regulators that wetlands supported by recycled<br />

water are subject to change and the perpetuity aspect comes into question. If a<br />

freshwater source is utilized this concern is eliminated. A portion of the Diamond Valley<br />

Ranch may be suitable to create mitigation wetlands.<br />

The potential use of recycled water in Nevada may require capacity conveyance improvements<br />

in the Diamond Ditch delivery system. Some of the projects described in this section address<br />

this need.<br />

<strong>South</strong> <strong>Tahoe</strong> <strong>Public</strong> <strong>Utility</strong> <strong>District</strong><br />

Recycled Water Facilities Master Plan - <strong>October</strong> <strong>2009</strong> Page 9-76

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!