22.01.2015 Views

Fort Erie Creeks Watershed Plan - Niagara Peninsula Conservation ...

Fort Erie Creeks Watershed Plan - Niagara Peninsula Conservation ...

Fort Erie Creeks Watershed Plan - Niagara Peninsula Conservation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1.5 Project Team<br />

The Project Team responsible for producing this <strong>Watershed</strong> <strong>Plan</strong> has been comprised of the<br />

following firms and key personnel:<br />

Firm Key Members Discipline<br />

Responsibilities<br />

Philips Engineering Ltd.<br />

Ron Scheckenberger, Project Manager<br />

Brian Bishop, Rizwan Ul-Haq<br />

Project Management –<br />

Water Resources<br />

Engineering, Water<br />

Quality<br />

Dougan and Associates Elizabeth Snell, Ken Ursic, Karl Konze Terrestrial Resources<br />

C. Portt and Associates Cam Portt, George Coker Fisheries, Benthic<br />

Resources, Water Quality<br />

Blackport and Associates Bill Blackport Hydrogeology<br />

Parish Geomorphic John Parish, Susi Kostyniuk Stream Morphology<br />

Shoreplan Engineering Inc. Milo Sturm Shoreline Engineering<br />

1.6 Reporting Structure<br />

This General Report provides detailed information related to the study process, analyses,<br />

assessment and recommendations. The General Report documents the following:<br />

• Subwatershed Characterization<br />

• Subwatershed Management Strategies<br />

• Implementation and Monitoring <strong>Plan</strong><br />

There are two appendices included with the General Report: a General Appendix, containing all<br />

of the consultation documents, followed by a Technical Appendix (bound under separate cover)<br />

containing the three following sub-appendices:<br />

• Natural Heritage System<br />

• Watercourse Systems<br />

• Stormwater Management<br />

A Summary Report has also been prepared, which provides an overview of the <strong>Watershed</strong> <strong>Plan</strong>,<br />

and focuses on the implementation procedure.<br />

March 2008 3 <strong>Fort</strong> <strong>Erie</strong> <strong>Creeks</strong> <strong>Watershed</strong> <strong>Plan</strong><br />

General Report (105116)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!