22.01.2015 Views

Fort Erie Creeks Watershed Plan - Niagara Peninsula Conservation ...

Fort Erie Creeks Watershed Plan - Niagara Peninsula Conservation ...

Fort Erie Creeks Watershed Plan - Niagara Peninsula Conservation ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Culvert<br />

ID<br />

<strong>Watershed</strong>s<br />

TABLE 2.3.1:<br />

FORT ERIE CREEKS STRUCTURE SUMMARY OF CULVERT DATA FROM FIELD AND BACKGROUND DATA<br />

Crossing<br />

Size (m)<br />

Span (m) Rise (m)<br />

Number of<br />

Culverts<br />

Footing Type<br />

Material<br />

Length<br />

(m)<br />

Slope<br />

(m/m)<br />

U/S Creek<br />

Invert (m)<br />

U/S Creek<br />

Obvert (m)<br />

64A Miller Creek Abundand Rail Track 2.50 2.10 1.00 Box Concrete 7.00 0.00 178.01 180.26 182.25<br />

64B Miller Creek CNR 1.00 Arch Stone 12.00 0.01 178.19 180.33 182.54<br />

64C Miller Creek Penn Central Railway 1.00 Open Stone 12.00 -0.01 177.57 180.33 182.00<br />

65 Miller Creek Bowen Road 3.00 1.50 1.00 Open Box Concrete 20.00 0.01 178.22 179.72 181.08<br />

66 Miller Creek Pettit Road - 0.90 2.00 Pipe Corrugated Steel 13.00 -0.01 179.80 180.67 182.18<br />

67 Kraft Drain Ashphalt Trail 3.00 2.00 1.00 CSPA Corrugated Steel 5.00 0.00 175.11 177.14 179.08<br />

68 A Kraft Drain Dominion Road 3.04 1.85 1.00 Box Concrete 15.00 0.02 175.79 177.4 178.18<br />

68 C Kraft Drain Edgemere Road 2.40 2.55 1.00 Open Box Concrete 6.50 -0.01 174.94 177.47 177.86<br />

68 B Kraft Drain Private Driveway 4.00 2.00 1.00 CSPA Corrugated Steel 1.50 0.01 175.11 177.14 179.08<br />

69 Kraft Drain Kraft Road - 0.85 1.00 CSP Corrugated Steel 9.50 0.01 178.58 179.38 179.83<br />

70 Kraft Drain Kraft Road 1.25 0.60 1.00 Box Concrete 9.00 0.01 180.02 181.23 181.80<br />

71 Bertie Bay Drain Macdonald Drive 1.00 1.00 1.00 Box Concrete 17.00 0.01 175.55 176.54 177.00<br />

72 Bertie Bay Drain Walking Trail 1.08 0.90 1.00 Box Stone 7.00 0.01 178.03 178.7 179.90<br />

73 Six Mile Creek Colony Road 14.40 2.60 1.00 Open Span Steel / Wood 4.00 0.00 173.08 175.69 176.35<br />

74 Six Mile Creek Colony Road 31.00 2.20 1.00 Open Span Steel / Wood 4.00 0.06 173.58 175.81 176.75<br />

75 Six Mile Creek Thunder Bay Road 9.00 2.50 1.00 Open Span Concrete 9.00 0.01 173.23 175.73 176.27<br />

76 Six Mile Creek Walking Trail 7.60 2.90 1.00 Bridge Abutment Steel / Stone 7.00 0.00 175.06 178.13 179.27<br />

77 Six Mile Creek Dominion Road 10.00 1.40 1.00 Bridge Abutment Concrete 12.50 0.00 175.02 176.78 177.43<br />

78 Six Mile Creek Centralia Ave. N. 2.40 1.40 1.00 Open Box Concrete 14.00 0.02 175.78 176.37 177.52<br />

79 Six Mile Creek Nigh Road 1.85 1.10 1.00 CSPA Corrugated Steel 10.00 0.00 177.30 178.53 179.06<br />

80 Six Mile Creek Stone Mill Road 2.10 1.20 1.00 Open Box Stone / Concrete 9.00 0.00 178.53 179.9 180.37<br />

81 Six Mile Creek Nigh Road 3.10 1.49 1.00 Open Box Concrete 13.50 -0.01 177.29 178.77 179.35<br />

82 Six Mile Creek Centralia Ave. N. 2.00 1.00 1.00 Open Box Concrete 8.40 -0.01 180.73 181.69 182.55<br />

83 Six Mile Creek Bernard Ave. 1.80 1.00 1.00 Open Box Concrete 7.50 -0.01 177.97 178.93 179.68<br />

84 Six Mile Creek Bernard Ave. 1.20 0.60 1.00 Open Box Concrete 7.80 -0.10 179.69 180.29 180.82<br />

85 Six Mile Creek Nigh Road 1.20 0.60 1.00 Open Box Concrete 7.00 0.03 180.58 181.22 181.81<br />

86A Six Mile Creek Nigh Road 1.50 1.00 1.00 Open Box Concrete 23.40 0.00 180.12 181.3 181.85<br />

86B Six Mile Creek Nigh Road 2.20 1.00 1.00 Open Box Concrete 12.60 -0.06 180.24 181.1 181.46<br />

Top of<br />

Road (m)<br />

March 2008 30 <strong>Fort</strong> <strong>Erie</strong> <strong>Creeks</strong> <strong>Watershed</strong> <strong>Plan</strong><br />

General Report (105116)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!