22.01.2015 Views

Fort Erie Creeks Watershed Plan - Niagara Peninsula Conservation ...

Fort Erie Creeks Watershed Plan - Niagara Peninsula Conservation ...

Fort Erie Creeks Watershed Plan - Niagara Peninsula Conservation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLE 6.1.10:<br />

SUMMARY OF PRIORITIZED LOCAL ACTIONS<br />

BERTIE BAY DRAINS & LAKE ERIE 1<br />

Element Urban Non-Urban Priority Land Ownership Proponency Cost Assumptions Cost ($1,000’s)<br />

Watercourses<br />

(erosion, fisheries)<br />

•<br />

•<br />

Reach BBD-2: rehabilitate straightened channel by reestablishing<br />

flow in the existing original natural channel.<br />

Remove culvert at mouth of watercourse that is presently a<br />

H<br />

H<br />

Private<br />

Private<br />

NPCA/Private<br />

NPCA/Private<br />

400 @ 500 200<br />

50<br />

barrier to fish migration<br />

Flooding<br />

(infrastructure,<br />

floodplain)<br />

Stormwater<br />

•<br />

•<br />

N/A<br />

Retrofit existing development with SWM H Private Town 1 Study 20<br />

Management • Peak flow and volume control required in subcatchment<br />

H Private Development 2 Facilities 400<br />

BER 102.<br />

Water Quality<br />

• Crescent Park, Dominion Pumping station overflow M Public Region 1 site specific study 10<br />

Natural Heritage<br />

System<br />

• Protect EPA’s; conserve ECA’s & LSA’s according to OP H Private NPCA Public awareness/stewardship 10<br />

• Where opportunity outside EPA and appropriate landscape (see<br />

M Private NPCA 10 @ $20<br />

200<br />

map NH8) and communities, enhance existing natural areas<br />

through slough mosaic reestablishment<br />

Regrade and replant 10 ha @ $20K/ha<br />

• Protect EPA’s; conserve ECA’s & LSA’s according to OP H Private NPCA/Town Public awareness/stewardship 10<br />

• Investigate if the EPA’s in the southwest corner should be<br />

expanded to accommodate the priority flagged by the Great<br />

Lakes <strong>Conservation</strong> Blueprint (Henson and Brodribb, 2005)<br />

• Enhance existing natural areas through slough mosaic<br />

reestablishment<br />

M Private NPCA Site specific study 10<br />

M Private NPCA 10 ha @ $3.5K/ha 35<br />

• Encourage shoreline owners to restore coastal habitats • Encourage shoreline owners to restore coastal habitats M Private NPCA 60 ha@ $3.5K/ha 210<br />

• Fill in corridor gaps or restore to protect recharge area, when<br />

opportunity<br />

M Private NPCA 5 ha @ $10/ha 50<br />

Subtotal: High $ 690,000.<br />

Subtotal: Medium $ 515,000.<br />

Total: $1,205,000.<br />

March 2008 196 <strong>Fort</strong> <strong>Erie</strong> <strong>Creeks</strong> <strong>Watershed</strong> <strong>Plan</strong><br />

General Report (105116)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!