TABLE 6.1.10:<br />
SUMMARY OF PRIORITIZED LOCAL ACTIONS<br />
BERTIE BAY DRAINS & LAKE ERIE 1<br />
Element Urban Non-Urban Priority Land Ownership Proponency Cost Assumptions Cost ($1,000’s)<br />
Watercourses<br />
(erosion, fisheries)<br />
•<br />
•<br />
Reach BBD-2: rehabilitate straightened channel by reestablishing<br />
flow in the existing original natural channel.<br />
Remove culvert at mouth of watercourse that is presently a<br />
H<br />
H<br />
Private<br />
Private<br />
NPCA/Private<br />
NPCA/Private<br />
400 @ 500 200<br />
50<br />
barrier to fish migration<br />
Flooding<br />
(infrastructure,<br />
floodplain)<br />
Stormwater<br />
•<br />
•<br />
N/A<br />
Retrofit existing development with SWM H Private Town 1 Study 20<br />
Management • Peak flow and volume control required in subcatchment<br />
H Private Development 2 Facilities 400<br />
BER 102.<br />
Water Quality<br />
• Crescent Park, Dominion Pumping station overflow M Public Region 1 site specific study 10<br />
Natural Heritage<br />
System<br />
• Protect EPA’s; conserve ECA’s & LSA’s according to OP H Private NPCA Public awareness/stewardship 10<br />
• Where opportunity outside EPA and appropriate landscape (see<br />
M Private NPCA 10 @ $20<br />
200<br />
map NH8) and communities, enhance existing natural areas<br />
through slough mosaic reestablishment<br />
Regrade and replant 10 ha @ $20K/ha<br />
• Protect EPA’s; conserve ECA’s & LSA’s according to OP H Private NPCA/Town Public awareness/stewardship 10<br />
• Investigate if the EPA’s in the southwest corner should be<br />
expanded to accommodate the priority flagged by the Great<br />
Lakes <strong>Conservation</strong> Blueprint (Henson and Brodribb, 2005)<br />
• Enhance existing natural areas through slough mosaic<br />
reestablishment<br />
M Private NPCA Site specific study 10<br />
M Private NPCA 10 ha @ $3.5K/ha 35<br />
• Encourage shoreline owners to restore coastal habitats • Encourage shoreline owners to restore coastal habitats M Private NPCA 60 ha@ $3.5K/ha 210<br />
• Fill in corridor gaps or restore to protect recharge area, when<br />
opportunity<br />
M Private NPCA 5 ha @ $10/ha 50<br />
Subtotal: High $ 690,000.<br />
Subtotal: Medium $ 515,000.<br />
Total: $1,205,000.<br />
March 2008 196 <strong>Fort</strong> <strong>Erie</strong> <strong>Creeks</strong> <strong>Watershed</strong> <strong>Plan</strong><br />
General Report (105116)