22.01.2015 Views

Fort Erie Creeks Watershed Plan - Niagara Peninsula Conservation ...

Fort Erie Creeks Watershed Plan - Niagara Peninsula Conservation ...

Fort Erie Creeks Watershed Plan - Niagara Peninsula Conservation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(b) River or stream valleys that have depressional features associated with a river or stream,<br />

whether or not they contain a watercourse, the limits of which are determined in accordance<br />

with the following rules:<br />

(i)<br />

(ii)<br />

(iii)<br />

where the river or stream valley is apparent and has stable slopes, the valley<br />

extends from the stable top of bank, plus 15 metres, to a similar point on the<br />

opposite side,<br />

where the river or stream valley is apparent and has unstable slopes, the valley<br />

extends from the predicted long term stable slope projected from the existing<br />

stable slope or, if the toe of the slope is unstable, from the predicted location of<br />

the toe of the slope as a result of stream erosion over a projected 100-year period,<br />

plus 15 metres, to a similar point on the opposite side,<br />

where the river or stream valley is not apparent, the valley extends the greater of,<br />

(A) the distance from a point outside the edge of the maximum extent of<br />

the flood plain under the applicable flood event standard, to a similar<br />

point on the opposite side, and<br />

(B) the distance of a predicted meander belt of a watercourse, expanded<br />

as required to convey the flood flows under the applicable flood<br />

standard, to a similar point on the opposite side;<br />

(c) hazardous lands;<br />

(d) wetlands; or<br />

(e) other areas where development could interfere with the hydrologic function of a wetland,<br />

including areas up to 120 metres of all provincially significant wetlands and wetlands greater<br />

than 2 hectares in size, and areas within 30 metres of wetlands less than 2 hectares in size, but<br />

not including those where development has been approved pursuant to an application made<br />

under the <strong>Plan</strong>ning Act or other public planning or regulatory process.<br />

The Black Creek, Beaver Creek, Baker Creek, Frenchman’s Creek, Miller Creek, Six Mile Creek<br />

and Kraft Drain are regulated based on the flood produced by the Regional Storm (100 year).<br />

The study area is regulated by a "one zone" policy, with no development allowed within the<br />

regulated area.<br />

The Town of <strong>Fort</strong> <strong>Erie</strong>’s storm drainage policies have been defined in a report: “Town of <strong>Fort</strong><br />

<strong>Erie</strong>, Storm Drainage Master <strong>Plan</strong>”, by Kerry T. Howe Engineering Ltd. April, 1993. The AES<br />

design storms for Port Colborne have been recommended for use in the Town of <strong>Fort</strong> <strong>Erie</strong>, and<br />

accordingly the design criteria for minor and major storms has been defined.<br />

The <strong>Niagara</strong> Parks Commission has a legislated mandate for the <strong>Niagara</strong> River corridor, <strong>Niagara</strong><br />

gorge, and environmental matters within their jurisdiction. The NPC will have regard to this<br />

document however, “the use of lands owned by the NPC is regulated under the provisions of the<br />

<strong>Niagara</strong> Parks Act R.S.O. 199, cN3. The provisions of this plan shall not apply to the lands of<br />

the <strong>Niagara</strong> Parks Commission so long as those lands are owned by the <strong>Niagara</strong> Parks<br />

Commission and are used for the purposes of the <strong>Niagara</strong> Parks Commission”.<br />

March 2008 101 <strong>Fort</strong> <strong>Erie</strong> <strong>Creeks</strong> <strong>Watershed</strong> <strong>Plan</strong><br />

General Report (105116)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!