STEP 3<br />

NOTE THE SEVEN-INCH DISTANCE<br />

FROM THE EAVE OF THE BIN TO THE<br />

CENTER LINE OF THE HOLES IN THE<br />

TRACK. Bins with steeply-pitched roofs<br />

may allow the 7" distance to be reduced.<br />

Roofs with the low or “flat” profiles may<br />

require more clearance. Reinforcements<br />

for the roof or inner ladders which might<br />

interfere with the movement of the <strong>Stir</strong>-<strong>Ator</strong><br />

should be trimmed off as indicated in<br />

Drawing A on page 33. If this cannot be<br />

done, the 7" distance from the eave to the<br />

bolt holes must be incresed<br />

proportionately.<br />

STEP 4<br />

There should be slightly more track<br />

material than is required. Upon making the<br />

complete circuit of the bin, the end of the<br />

last section should be cut off so as to fit<br />

snugly against the forward end of the first<br />

length and a 7/16" hole drilled, 5/8" from<br />

the cut-off end. ALL TRACK JOINTS<br />

SHOULD BE ALIGNED AS SMOOTHLY<br />

AS POSSIBLE. Mis-alignment should be<br />

corrected by filing or bending, if necessary.<br />

STEP 5<br />

Because the <strong>Stir</strong>-<strong>Ator</strong> augers run very<br />

close to the bin wall, INSIDE WALL<br />

LADDERS MUST BE MOUNTED VERY<br />

CLOSE TO THE BIN WALL. If this cannot<br />

be accomplished, the ladder must be<br />

removed. A portable ladder is advised, and<br />

this can be obtained form your dealer. If<br />

the walk in door protrudes over 2-1/2" into<br />

the bin itself, SKID PLATES SHOULD BE<br />

PUT ON THE DOOR so that the augers<br />

will not get caught during <strong>Stir</strong>-<strong>Ator</strong><br />

operation.<br />

Photo 1<br />

STEP 6<br />

At this time, hook the three suspension chain hooks over the<br />

top edge of the fill hole. Space them equally around the fill<br />

hole. See Drawing B on page 36 or Photo 1.<br />

STEP 7<br />

Install the switch box above the inspection hole. Be sure the<br />

<strong>Red</strong> <strong>Giant</strong> will not hit it, and do not forget the brace. See Photo<br />

1 or Drawing A on page 33.<br />

Lead-in cord and shut-off chain need to be positioned so that<br />

the <strong>Stir</strong>-<strong>Ator</strong> will not catch them as it rotates around the bin.<br />

NOTE THE CLEARANCE REQUIREMENTS IN<br />

DRAWING A AND B.<br />

14 PNEG-1358 <strong>Red</strong> <strong>Giant</strong> <strong>Stir</strong>-<strong>Ator</strong>