Salient Features of PAF Supported Infrastructure & Per unit Cost<br />

Infrastructure for Rural Access<br />

During the reporting <strong>year</strong>, four bridges (769 m length), nine culverts (33 meter in length), 27 rural roads (51 km in length) and three trail roads (4 km in<br />

length) have been completed whereas in cumulative scenario, a total of 20 bridges (<strong>11</strong>90 m length), 80 culverts (280 meter in length), 127 rural roads<br />

(204 km in length) and 10 trail roads (19 km in length) have been completed.<br />

Table 14: Per unit cost for rural access sub projects<br />

Salient Features<br />

Per unit cost<br />

SN Rural access<br />

Unit FY 2067/68 Cumulative FY 2067/68 Cumulative<br />

1 Bridge m 769 <strong>11</strong>90 14739 16145<br />

2 Culvert m 33 280 <strong>11</strong>8691 75196<br />

3 Road & its maintenance km 51 204 871648 859130<br />

4 Trail Road km 4 19 699125 253078<br />

Here per unit cost of bridge in the reporting fiscal <strong>year</strong> is less than that of cumulative as long as bridges were completed with less per unit cost.<br />

chart 27: Per Household Community Contribution<br />

8,000<br />

7,000<br />

6,000<br />

5,000<br />

4,000<br />

3,000<br />

2,000<br />

1,000<br />

0<br />

Rural Access Community Rural Energy Small Irrigation Water Supply Miscellaneous Total<br />

Building<br />

& Sanitation<br />

FY 2067/68<br />

Cumulative<br />

Community Buildings<br />

Till now, PAF has supported for school, health post, community building and agriculture related building (cellar storage, market shed, milk/ vegetable<br />

collection center). In FY <strong>2010</strong>/<strong>11</strong>, 129 school buildings (626 rooms) have been constructed and maintained. One health post (2 rooms), four agriculture<br />

related buildings (13 rooms) and eight other types of community buildings (23 rooms) are constructed, whereas in cumulative, 272 school buildings<br />

(1,101 rooms), 5 health posts (16 rooms), <strong>11</strong> agriculture related buildings (22 rooms) and 45 other types of community buildings (41 rooms) are<br />

constructed 664 number of rooms having 27655 m2 plinth area have been constructed during the reporting <strong>year</strong> and 1220 rooms having 48874 m2<br />

plinth area were constructed in cumulative. Recently completed building’s unit cost is Rs. 3<strong>11</strong>,277/room and Rs 7,474/m2 area and in cumulative, its<br />

value is 300,189/room and 7,493/m2 plinth area.<br />

Table 15: Per unit cost for Community Buildings Construction<br />

SN<br />

Building<br />

Salient Features<br />

Per unit cost<br />

Unit FY 2067/68 Cumulative FY 2067/68 Cumulative<br />

1 Building Room No & Plinth Area 664/ room (27655 m2<br />

plinth area)<br />

1220/ room<br />

(48874 m2 plinth area)<br />

3<strong>11</strong>277/ room and Rs<br />

7474/m2<br />

300189/ room and<br />

7493/m2 plinth area.<br />

ANNUAL PROGRESS REPORT (<strong>2010</strong>/20<strong>11</strong>) 19