EVALUATION OF SEAWATER DESALINATION PROJECTS<br />

PROPOSED FOR THE MONTEREY PENINSULA<br />

2 Project Summaries<br />

The following project summaries provide key information for each <strong>of</strong> the projects. Each<br />

summary includes:<br />

• Project name<br />

• Proponent(s)<br />

• Location<br />

• Purpose<br />

• Production volume<br />

• Key features<br />

• Facility map<br />

• Key information provided to review team<br />

• Persons interviewed<br />

The four projects are distinctly dissimilar and are at various stages <strong>of</strong> development. Each <strong>of</strong><br />

the projects has identified a unique location, although the CWP and MBRSDP have adjacent<br />

proposed locations in Moss Landing at the MLPP and NMRC site, respectively. Similarly,<br />

the proposed treated water pipeline alignment from the proposed desalination plants to the<br />

southern users differ, although the CWP and MBRSDP alignments have similar elements.<br />

Each <strong>of</strong> the three terrestrially based proposed desalination plant treatment capacities is<br />

different. These differences are due primarily to differing project purposes. The CWP is<br />

proposed by CAW as the Basic CWP, with the intent to address SWRCB Order No. 95-10<br />

and a portion <strong>of</strong> the Seaside Groundwater Basin overdraft. However, the Regional CWP<br />

alternative has capacities and intended users similar to the MBRSDP.<br />

Monterey Peninsula Water Management District 2-1