EVALUATION OF SEAWATER DESALINATION PROJECTS<br />

PROPOSED FOR THE MONTEREY PENINSULA<br />

7.1 Coastal Water Project (CWP)<br />

Schedule Identified<br />

Figure 8 presents the project schedule provided by the project proponents in May 2007.<br />

Figure 8 – Coastal Water Project Schedule<br />