EVALUATION OF SEAWATER DESALINATION PROJECTS<br />

PROPOSED FOR THE MONTEREY PENINSULA<br />

6 Regional Water Supply Considerations<br />

In this section, each <strong>of</strong> the four projects is qualitatively evaluated on its potential to:<br />

• Provide regional solutions,<br />

• Expand to meet future needs,<br />

• Impede or preclude future projects, and<br />

• Impact disadvantaged communities.<br />

Table 10 provides a brief summary <strong>of</strong> each project’s size and the areas served.<br />

Table 10 – Summary <strong>of</strong> Project Size and Areas Served<br />

Project Name<br />

Coastal Water<br />

Project<br />

Monterey Bay<br />

Regional<br />

<strong>Desalination</strong><br />

Project<br />

Sand City<br />

<strong>Desalination</strong><br />

Project<br />

<strong>Seawater</strong><br />

<strong>Desalination</strong> Vessel<br />

Areas served<br />

CAW service<br />

territory on the<br />

Monterey Peninsula<br />

Monterey Peninsula,<br />

Northern Monterey<br />

County, P/SMCSD<br />

service areas,<br />

portions <strong>of</strong><br />

PVWMAP 2<br />

CAW service<br />

territory on the<br />

Monterey Peninsula<br />

CAW service<br />

territory on the<br />

Monterey Peninsula<br />

Maximum<br />

Production Volume<br />

10,430 ac-ft/ year 1 22,400 ac-ft/year 3,4 8,400 ac-ft/year 22,400 ac-ft/year 4<br />

Production Rate 10 mgd 20 mgd 7.5 mgd 20 mgd<br />

Provides 10,730 acft<br />

per year<br />

Order No. 95-10<br />

replacement supply<br />

Yes Yes No Yes<br />

1<br />

Expandable to 18,972 ac-ft/ year for a regional project and to serve build-out demand on the Monterey Peninsula.<br />

2<br />

Pajaro Valley Water Management Agency.<br />

3<br />

Demands totaling 20,930 ac-ft/ year have been identified.<br />

4<br />

Providing maximum volume may not be possible unless storage or supplemental sources are provided to meet peak<br />

demands.<br />

6.1 Coastal Water Project (CWP)<br />

Currently, the Coastal Water Project (CWP) is progressing as the Basic CWP, which will<br />

provide enough desalinated water to comply with SWRCB Order No. 95-10. A larger<br />

regional project providing an additional 8,542 acre-feet per year to meet planned growth on<br />

the Monterey Peninsula and to supply water to Northern Monterey County, Castroville, and<br />

Marina has been studied. An option is under consideration by California American Water<br />

(CAW) as part <strong>of</strong> the CPUC environmental review process to upsize the CWP conveyance<br />

Monterey Peninsula Water Management District 6-1