27.02.2015 Views

FINAL REPORT Evaluation of Seawater Desalination Projects ...

FINAL REPORT Evaluation of Seawater Desalination Projects ...

FINAL REPORT Evaluation of Seawater Desalination Projects ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EVALUATION OF SEAWATER DESALINATION PROJECTS<br />

PROPOSED FOR THE MONTEREY PENINSULA<br />

3.2 Monterey Bay Regional <strong>Seawater</strong> <strong>Desalination</strong> Project<br />

(MBRSDP)<br />

Project Purpose<br />

The MBRSDP is proposed by Pajaro/Sunny Mesa Community Services District (P/SMCSD)<br />

to enable the Monterey Peninsula area to comply with SWRCB Order No. 95-10, to <strong>of</strong>fset<br />

overdraft <strong>of</strong> the Seaside Groundwater Basin, and to provide supplemental water supplies to<br />

serve portions <strong>of</strong> Northern Monterey County.<br />

Customers Identified<br />

The MBRSDP will serve the Monterey Peninsula, the service area <strong>of</strong> the P/SMCSD, and<br />

other areas <strong>of</strong> Northern Monterey County and portions <strong>of</strong> the Pajaro Valley Water<br />

Management Agency 13 service area. A regional desalination plant capable <strong>of</strong> meeting the<br />

regional requirements is envisioned. The plant would be constructed in phases as additional<br />

users are brought into the system.<br />

However, although at present the identified project water demands include 10,730 ac-ft per<br />

year to comply with SWRCB order No. 95-10 and 3,000 ac-ft per year to reduce overdraft <strong>of</strong><br />

the Seaside Groundwater Basin, no additional supply is proposed to meet future demands in<br />

the Monterey Peninsula area.<br />

Technology Appropriate/Demonstrated on this or Similar Supply<br />

The technical description for the MBRSDP is included in the Conceptual Design Report<br />

13<br />

(CDR) and the project’s Proposition 50 Pilot Project Grant Application to California<br />

Department <strong>of</strong> Water Resources.<br />

14 Both documents were prepared by Poseidon Resources<br />

for P/SMCSD.<br />

The proposed treatment process is based on the use <strong>of</strong> RO to accomplish the water quality<br />

objectives <strong>of</strong> the project. The proposed feed water source has been documented to<br />

experience high turbidity, and extensive pretreatment systems have been included to provide<br />

suitable feed water to the RO process.<br />

Pretreatment<br />

Currently, clarification followed by filtration is anticipated to be the major pretreatment<br />

steps. The project will rely on pilot testing to identify the optimum pretreatment approach.<br />

13 Pajaro/Sunny Mesa Community Services District in Cooperation with Poseidon Resources Corporation,<br />

Monterey Bay Regional <strong>Desalination</strong> Project, Conceptual Design Report, April 2006.<br />

14 Pajaro/Sunny Mesa Community Services District, Monterey Bay Regional <strong>Desalination</strong> Project, Proposition<br />

50 P/SMCSD Pilot Demonstration Project Grant Application, March 22, 2006.<br />

Monterey Peninsula Water Management District 3-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!