27.02.2015 Views

FINAL REPORT Evaluation of Seawater Desalination Projects ...

FINAL REPORT Evaluation of Seawater Desalination Projects ...

FINAL REPORT Evaluation of Seawater Desalination Projects ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EVALUATION OF SEAWATER DESALINATION PROJECTS<br />

PROPOSED FOR THE MONTEREY PENINSULA<br />

Quality <strong>of</strong> Supporting Documentation<br />

The CWP has the most comprehensive documentation <strong>of</strong> the three terrestrially based<br />

projects. The most specific project documentation includes the Conceptual Design Report<br />

and the Proponent’s Environmental Assessment.<br />

The Conceptual Design Report (CDR) includes the following sections:<br />

• Source Water Intake and Brine Disposal<br />

• <strong>Desalination</strong> Plant<br />

• <strong>Desalination</strong> Water Conveyance System<br />

• Aquifer Storage and Recovery Facilities<br />

• Proposed Project Costs<br />

The CDR provides studies and layouts <strong>of</strong> many <strong>of</strong> the proposed facilities. The quality <strong>of</strong> the<br />

work is good and it provides a good understanding <strong>of</strong> the design concepts, thus facilitating<br />

the accuracy <strong>of</strong> the construction cost estimates.<br />

The CDR includes as appendices the pipeline alignment drawings and project costs. The<br />

pipeline alignment drawings, at a scale <strong>of</strong> 1” = 80’, show the alignment on aerial<br />

photographs. Pr<strong>of</strong>ile information has been limited to critical crossings such as water courses<br />

and highways. The information shown is <strong>of</strong> good quality and this conceptual information<br />

would assist the CWP team’s construction cost estimating efforts.<br />

The PEA is another well-prepared document showing project-specific detail appropriate to<br />

the project status. The body <strong>of</strong> the PEA includes site-specific information including relevant<br />

conceptual designs and environmental impacts. Also included in the PEA are detailed<br />

studies shown in the Appendices and Technical Memoranda.<br />

Appendices to the PEA for the CWP are as follows:<br />

• Air Quality Data<br />

• Computational Fluid Dynamics Modeling for Moss Landing Power Plant<br />

• Addendum to Computational Fluid Dynamics Modeling for Moss Landing Power<br />

Plant<br />

• Flow Science: Draft Working Documents<br />

• Visual Simulation Methodology for the Coastal Water Project<br />

• Public Scoping Summary<br />

• Flow Science: Draft Technical Memorandum<br />

• List <strong>of</strong> Property Owners for the Coastal Water Project<br />

Monterey Peninsula Water Management District 3-7