EVALUATION OF SEAWATER DESALINATION PROJECTS<br />

PROPOSED FOR THE MONTEREY PENINSULA<br />

Potential Shared Distribution Facilities with Marina Coast Water District<br />

Representatives <strong>of</strong> CAW and the Marina Coast Water District (MCWD) have discussed the<br />

potential for sharing major distribution system facilities (pipelines, booster pumps, valves,<br />

etc.) for the portion <strong>of</strong> the CWP delivery system between the desalination plant to the CAW<br />

service area that runs through the MCWD service area (City <strong>of</strong> Marina and adjacent areas,<br />

and the former Fort Ord Military Reservation) (see Figure 2). The purposes <strong>of</strong> the shared<br />

facilities are to reduce costs to both service areas and to allow an interconnection that would<br />

allow water from one system to be provided to the other in case <strong>of</strong> an emergency. No firm<br />

estimate <strong>of</strong> potential cost savings is available, and potential institutional arrangements among<br />

CAW, MCWD, and regulatory agencies have not been addressed.<br />

Figure 2 - Potential CAW/MCWD Shared Facilities<br />

Monterey Peninsula Water Management District 2-4