EVALUATION OF SEAWATER DESALINATION PROJECTS<br />

PROPOSED FOR THE MONTEREY PENINSULA<br />

Facility<br />

Table 3 – CWP 2005 Capital Cost<br />

Cost<br />

<strong>Desalination</strong> Facilities<br />

<strong>Seawater</strong> Feed and Brine Disposal<br />

$6,260,000<br />

Residuals Handling and Treatment<br />

$1,220,000<br />

<strong>Desalination</strong> Processes<br />

$77,200,000<br />

Subtotal, <strong>Desalination</strong> Facilities<br />

$84,680,000<br />

<strong>Desalination</strong> Water Conveyance Pipelines<br />

Moss Landing DWSC Pipeline<br />

$6,900,000<br />

TAMC RR DWSC Pipeline<br />

$11,700,000<br />

Seaside DWSC Pipeline<br />

$4,100,000<br />

Subtotal, DWCS Pipelines<br />

$22,700,000<br />

Terminal Reservoir and ASR Pump Station $5,400,000<br />

Subtotal this page $112,780,000<br />

Segunda/ ASR System<br />

Tarpy Flats Pump Station<br />

$3,900,000<br />

Segunda Pump Station Upgrade<br />

$360,000<br />

Segunda Pipeline<br />

$4,800,000<br />

ASR Pipeline<br />

$1,500,000<br />

ASR Wells<br />

$3,560,000<br />

Subtotal, Segunda/ ASR System<br />

$14,120,000<br />

Total Construction Costs $126,900,000<br />

Implementation Costs @ 24%<br />

$30,456,000<br />

ROW/ Easement/ Land Costs<br />

$2,000,000<br />

Capital Costs without Contingency<br />

$159,356,000<br />

Contingency @ 10%<br />

$15,935,600<br />

Pilot Plant<br />

$2,585,000<br />

Capital Cost with Contingency $178,000,000<br />

Comments on the reasonableness <strong>of</strong> the quantities and unit costs <strong>of</strong> the capital cost estimate<br />

are as follows:<br />

• The original Pridesa Preliminary Budget value for the MF system is considered<br />

relatively high for this capacity. Competitive procurement <strong>of</strong> this equipment is<br />

expected to be 25 percent lower than the indicated value.<br />

• The RO costs include $1.5M for “RO containment structures.” It is not apparent what<br />

this item is or whether it is appropriate.<br />

• The basis for the 33 percent reduction factor to adjust the Conkey Regional scale<br />

project to the Proposed Project has not been provided.<br />

Monterey Peninsula Water Management District 5-5