EVALUATION OF SEAWATER DESALINATION PROJECTS<br />

PROPOSED FOR THE MONTEREY PENINSULA<br />

subject to a confidentiality agreement between WSC and B-E. The SDV fuel cost estimate is<br />

based on receipt <strong>of</strong> a subsidized price credit on biodiesel fuel. Proponents estimate a power<br />

cost <strong>of</strong> approximately $0.05/kWh with the price credit, and approximately double this<br />

amount without the credit. The biodiesel without price credit is provided since price credit<br />

may not continue indefinitely. The cost without the price credit is approximately the same as<br />

the probable fuel alternative, bunker fuel. Costs associated with pumping water into the<br />

regional distribution system were not included in the proponent’s cost estimate 46 . Total<br />

O&M costs are shown in Table 9.<br />

Table 9 – SDV 2006 Operations and Maintenance Annual Costs<br />

Component<br />

Cost<br />

Power for SDV Operations & pumping to shore<br />

Chemicals<br />

Membrane replacement, cleaning, and other spare parts<br />

Labor for Operation and Maintenance <strong>of</strong> SDV<br />

Labor for Operation and Maintenance <strong>of</strong> Barges<br />

Total O&M with Membrane Replacement $16,262,000<br />

Financing –Identification & Adequacy<br />

The project proponents are proposing a public/private partnership with the MPWMD and/or<br />

with a regional entity, comprised <strong>of</strong> local water agencies. The form <strong>of</strong> the contract has not<br />

been determined along with the terms and conditions <strong>of</strong> a potential contract. The project<br />

proponents can obtain traditional project financing consisting <strong>of</strong> a long-term debt portion and<br />

a project equity portion, and have proposed the concept <strong>of</strong> full private funding with a peracre-foot<br />

contractual arrangement with water users. No other details or components have<br />

been developed.<br />

Quality <strong>of</strong> Cost Estimate<br />

The scope <strong>of</strong> services for this study excludes rigorous analysis <strong>of</strong> the marine-based<br />

components <strong>of</strong> this proposal. Thus, no representation <strong>of</strong> the reasonableness <strong>of</strong> the ship,<br />

anchorages, shuttle barges, and seabed pipeline is presented. Costs were provided under a<br />

non-disclosure arrangement required by the proponents and are generally summarized and<br />

lack detail. Costs provided were for a SDV producing 20 mgd, but included only 18 mgd in<br />

distribution capacity. No detail on how the seabed pipeline would be anchored and protected<br />

is provided. To avoid visual aesthetic impacts, it is likely the anchoring location would<br />

require a substantially lengthened seabed pipeline extending into significantly deeper water<br />

which would require materials tolerant <strong>of</strong> greater pressures at significantly increased cost.<br />

46 No docking facility or transfer works is required if the seabed pipeline alternative is implemented.<br />

Monterey Peninsula Water Management District 5-18