31.03.2015 Views

Dam Synchronisation and Flood Releases - agriwaterpedia.info

Dam Synchronisation and Flood Releases - agriwaterpedia.info

Dam Synchronisation and Flood Releases - agriwaterpedia.info

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DAM SYNCHRONISATION AND FLOOD RELEASES IN THE ZAMBEZI RIVER BASIN: ANNEX 4 OF FINAL REPORT<br />

<strong>Flood</strong> risk mapping<br />

As for the Chobe River case study, a series of maps have been prepared showing how a system<br />

for flood risk classification could be applied to this site. An outline of these maps is provided<br />

below (note that details explained in the Chobe River case study that also apply to this study<br />

have not been repeated):<br />

<br />

<br />

<br />

<br />

Map 1 Caia – <strong>Flood</strong> Inundation Mapping for the Lower Zambezi River near Caia Case Study: this map<br />

shows the 2008 flood inundation extent based on data obtained from UNOSAT. This was<br />

the largest flood for which inundation data was available, the 2001 flood being slightly<br />

smaller.<br />

Map 2 Caia - Conceptual <strong>Flood</strong> Risk Mapping for Community Education, Zambezi River near Caia Case<br />

Study: as for the Chobe River case study, this map shows how the available flood inundation<br />

data could be used to identify areas where the awareness of the community should be raised<br />

through education <strong>and</strong> training on how to respond to flood situations.<br />

Map 3 Caia – Conceptual <strong>Flood</strong> Risk Mapping for Regulation of New Development, Zambezi River near<br />

Case Study: as for the Chobe River case study, the main purpose of this map is to demonstrate<br />

how historical flood inundation data could be used to regulate new development.<br />

Map 4 Caia – Conceptual <strong>Flood</strong> Risk Mapping for Warning <strong>and</strong> Rescue, Caia Case Study: the last map<br />

in the series demonstrates how flood risk mapping could be used to develop mobilization<br />

<strong>and</strong> response plans for evacuation of people in potentially flooded areas to higher ground<br />

refuge areas in a flood situation.<br />

G-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!