DAM SYNCHRONISATION AND FLOOD RELEASES IN THE ZAMBEZI RIVER BASIN: ANNEX 4 OF FINAL REPORT<br />

Sub-Project<br />

Gwayi<br />

Gwayi<br />

Shangani<br />

Gwayi<br />

Umguza<br />

Table 4.2: Possible dam sites in Gwayi <strong>and</strong> Shangani catchment (ZINWA, 2010)<br />

Tributary<br />

H Lat. Long.<br />

(m) º S º E<br />

<strong>Dam</strong> Characteristics<br />

Live<br />

Storage<br />

Capacity<br />

(Mm 3 )<br />

Expected Yield<br />

(Mm 3 /annum)<br />

Gwayi 70.0 18.551 27.219 635 57<br />

Estimated<br />

Cost (2005)<br />

(Million US$)<br />

Gwayi 19.498 27.768 195 30 83<br />

Bubi Lupane Bubi 20.0 18.922 27.719 40 11 10<br />

Sanyati<br />

Kudu Munyati 72.7 18.262 29.383 1,550 380 160<br />

Table 4.3: Possible dam sites in Mazowe catchment, contributing to diminished flows in the Luenha (ZINWA,<br />

2010)<br />

Sub-Project<br />

Mazowe<br />

Tributary<br />

H Lat. Long.<br />

(m) º S º E<br />

<strong>Dam</strong> Characteristics<br />

Live<br />

Storage<br />

Capacit<br />

y<br />

(Mm 3 )<br />

Expected Yield<br />

(Mm 3 /annum)<br />

Estimated<br />

Cost (2005)<br />

(Million<br />

US$)<br />

Chitse Ruya unknown 16.707 31.611 290 140 140<br />

Silver<br />

Msengezi 47.0 16.762 31.196 140 33 190<br />

Stroom<br />

Bindura Mazowe 44.0 17.263 31.281 87 36 90<br />

Kunzvi Mazowe 146 100 67<br />

Gwayi<br />

Gwayi Shangani<br />

ZINWA has indicated that for the Gwayi, the Gwayi Shangani dam with a storage capacity of<br />

635 Mm 3 seems most feasible <strong>and</strong> will contribute to flood control (interview 28 April 2010).<br />

Located at the confluence of the Shangani with the Gwayi, it controls an important part of the<br />

Gwayi catchment (nearly 39 000 km 2 ). ZINWA indicated that dam construction is in progress at<br />

this site, with the contractor already on site for construction of the scheme. but unfortunately the<br />

project is currently suspended due to financial reasons. Its sizeable live storage capacity of 635<br />

Mm 3 will provide a significant flood attenuation effect. The main purpose of this dam is to<br />

supply water to Bulawayo, some 270 km south west of the dam site. The hydropower capacity of<br />

this dam is a mere 2 MW <strong>and</strong> would be primarily used to supply power to the pumping station<br />

required to convey the water to Bulawayo. A possibility of doubling the hydropower capacity<br />

through some redesign was also mentioned. Thus, the dam would combine water supply <strong>and</strong><br />

hydropower generation. To serve for flood protection also, would need an additional objective in<br />

36