14.04.2015 Views

Cobram 2025 Cobram Strategy Plan - Moira Shire Council

Cobram 2025 Cobram Strategy Plan - Moira Shire Council

Cobram 2025 Cobram Strategy Plan - Moira Shire Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Cobram</strong> <strong>Strategy</strong> <strong>Plan</strong><br />

Final Report<br />

of <strong>Cobram</strong>. The Figure 4 below shows the current location of the Land Subject to<br />

Inundation (lighter grey shade) and the Floodway Overlay (darker grey shade).<br />

It is recommended that <strong>Council</strong> work closely with GB, CMA to prepare a strategy<br />

to flood proof the immediate surrounds of <strong>Cobram</strong>.<br />

Figure 4: Existing Flood Constraints for <strong>Cobram</strong><br />

3.5 Cultural Heritage<br />

Clause 15.11-1 of the <strong>Moira</strong> <strong>Plan</strong>ning Scheme refers to heritage significance.<br />

Specifically, the objective of this clause is “To assist the conservation of places<br />

that have natural, environmental, aesthetic, historic, cultural, scientific or social<br />

significance or other special value important for scientific and research purposes,<br />

as a means of understanding our past, as well as maintaining and enhancing<br />

Victoria’s image and making a contribution to the economic and cultural growth of<br />

the State”.<br />

Heritage Studies are currently underway for both the <strong>Cobram</strong> Town Centre<br />

Precinct and the <strong>Cobram</strong> Church Precinct (draft reports prepared in June 2006).<br />

These reports have assisted in informing this <strong>Strategy</strong> <strong>Plan</strong>.<br />

3.6 Servicing and Infrastructure<br />

Servicing and infrastructure of existing and proposed new development areas is<br />

an essential consideration of any <strong>Strategy</strong> <strong>Plan</strong>. Infrastructure should be used<br />

and provided in an efficient and effective manner. <strong>Cobram</strong> is serviced by<br />

Goulburn Valley Water for the provision of reticulated water and sewer, Telstra for<br />

telecommunications, Powercor for electricity and the <strong>Council</strong> is the responsible<br />

drainage authority. Servicing and infrastructure comments in regard to specific<br />

types of land use activities are considered and addressed in this <strong>Strategy</strong> <strong>Plan</strong>.<br />

© Coomes Consulting Group G:\13\131654\PL11 001 <strong>Strategy</strong> <strong>Plan</strong> Final Report.doc<br />

page 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!