14.04.2015 Views

Cobram 2025 Cobram Strategy Plan - Moira Shire Council

Cobram 2025 Cobram Strategy Plan - Moira Shire Council

Cobram 2025 Cobram Strategy Plan - Moira Shire Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Cobram</strong> <strong>Strategy</strong> <strong>Plan</strong><br />

Final Report<br />

− Encourage the adoption of the traffic and transport networks and management<br />

as identified in the <strong>Cobram</strong> Development <strong>Plan</strong> prepared by Earth Tech<br />

throughout other areas proposed to be included in the Development <strong>Plan</strong><br />

Overlay.<br />

− Continue to encourage the provision of public transport to service <strong>Cobram</strong>.<br />

12.6 Recommendations for Community Facilities<br />

12.6.1 Amendment to the <strong>Moira</strong> <strong>Plan</strong>ning Scheme<br />

− Amend Clause 21.04 to replace the existing Settlement Strategies with the<br />

revised Settlement Strategies as per Section 13<br />

− Amend Clause 21.04 to replace the <strong>Cobram</strong> Structure <strong>Plan</strong> with the <strong>Cobram</strong><br />

<strong>Strategy</strong> <strong>Plan</strong> as per Figure 12 in Section 13<br />

12.6.2 Other Actions<br />

− Undertake a Social <strong>Plan</strong> for the municipality (note – it is understood that this is<br />

currently underway)<br />

− Facilitate the implementation of the recommendations of the <strong>Cobram</strong> Urban<br />

Design Framework, prepared by David Lock & Associates<br />

− Ensure the requirements of the Development <strong>Plan</strong> Overlay (as recommended<br />

in Section 12.1.1 above) include provision for appropriately located community<br />

facilities.<br />

− Undertake discussions with tertiary and further education providers to facilitate<br />

the provision of such courses/subject in <strong>Cobram</strong>.<br />

12.7 Recommendations for Rural and Agricultural Lands<br />

12.7.1 Amendment to the <strong>Moira</strong> <strong>Plan</strong>ning Scheme<br />

− Amend Clause 21.04 to replace the existing Settlement Strategies with the<br />

revised Settlement Strategies as per Section 13<br />

− Amend Clause 21.04 to replace the <strong>Cobram</strong> Structure <strong>Plan</strong> with the <strong>Cobram</strong><br />

<strong>Strategy</strong> <strong>Plan</strong> as per Figure 12 in Section 13<br />

12.7.2 Other Actions<br />

− Undertake a Social <strong>Plan</strong> for the municipality (note – it is understood that this is<br />

currently underway)<br />

− In consultation with the Departments of Sustainability and Environment and<br />

Primary Industries, prepare a policy on the treatment of the rural/urban<br />

interface.<br />

− As appropriate amend the <strong>Strategy</strong> <strong>Plan</strong> to reflect the recommendations of the<br />

Rural Lands Review (note – it is understood this project is soon to commence).<br />

© Coomes Consulting Group G:\13\131654\PL11 001 <strong>Strategy</strong> <strong>Plan</strong> Final Report.doc<br />

page 83

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!