CORRIGENDUM NO. 3 to RFP Notice No. 10 of 2013 - Gujarat State ...
CORRIGENDUM NO. 3 to RFP Notice No. 10 of 2013 - Gujarat State ...
CORRIGENDUM NO. 3 to RFP Notice No. 10 of 2013 - Gujarat State ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
8<br />
9<br />
<strong>10</strong><br />
11<br />
12<br />
<strong>10</strong>5<br />
2/246<br />
and<br />
5/249<br />
Videoconferencin<br />
g Room / Display<br />
facilities<br />
a) Systems and<br />
sub systems <strong>to</strong> be<br />
tested<br />
b)Equipment<br />
installed at ERC,<br />
DEOC and TEOC in<br />
standalone modes<br />
and in network<br />
mode<br />
<strong>10</strong>7 1.3.5 Call Center NA<br />
Page 150<br />
-<br />
<strong>No</strong>minal<br />
specifications for<br />
Multipoint Control<br />
Unit<br />
<strong>No</strong>minal<br />
specifications for<br />
Multipoint Control<br />
Unit<br />
Large VC camera <strong>to</strong> cover every<br />
person in the room with<br />
capability <strong>to</strong> track speaker<br />
au<strong>to</strong>matically<br />
a) Systems and sub systems <strong>to</strong><br />
be tested b)Equipment<br />
installed at ERC, DEOC and TEOC<br />
in standalone modes and in<br />
network mode<br />
Conferencing capability<br />
addition<br />
Please delete "capability <strong>to</strong> track speaker<br />
au<strong>to</strong>matically" (i) the au<strong>to</strong> tracking works<br />
erroneously in such a briefing room with<br />
multiple participants. (ii) The ideal range<br />
<strong>of</strong> the au<strong>to</strong> tracking is normally 23 feet,<br />
thus a large size room with 24 participants<br />
having 12 seats on one side <strong>of</strong> the table<br />
this will not work well. (iii) Au<strong>to</strong> tracking is<br />
a proprietary feature <strong>of</strong> only one OEM.<br />
This limits the competition.<br />
Pl clarify the Standalone and network<br />
mode….….. Does Standalone mode refer<br />
<strong>to</strong> survivability <strong>of</strong> the DEOC and TEOC<br />
location?<br />
Tender is looking for IVR system. Request<br />
you please share the IVR call flow & what<br />
all services are <strong>to</strong> be extended on IVR. Is it<br />
also expected o integrate the IVR / ACD<br />
system with the backend Portal / DB.<br />
Would request the resolution at which<br />
such calls are <strong>to</strong> be made as <strong>10</strong>0<strong>No</strong>s. 720p<br />
resolution calls would not be the same as<br />
<strong>10</strong>0<strong>No</strong>s. CIF calls, would also request for<br />
dynamic allocation <strong>of</strong> resources such that<br />
<strong>10</strong>0<strong>No</strong>. 720p calls or 400<strong>No</strong>s. VoIP calls<br />
could be specified instead <strong>of</strong> <strong>10</strong>0<br />
video/voice which is ambiguous.<br />
Request the clause for Scalability <strong>to</strong> higher<br />
capacity without change in main hardware<br />
, by either cards or licenses as and when<br />
required<br />
Requirements are worked out<br />
on the basis <strong>of</strong> needs <strong>of</strong> the<br />
organization and not on<br />
manufacturer.<br />
<strong>No</strong> change<br />
Standalone mode will check<br />
connectivity <strong>of</strong> various<br />
equipment within a location,<br />
where as network mode applies<br />
<strong>to</strong> interconnectivity <strong>of</strong> all nodes<br />
on statewide networks. This<br />
doesn't refer <strong>to</strong> survivability <strong>of</strong><br />
DEOC , and TEOC<br />
IVR is meant for dissemination<br />
<strong>of</strong> updates on disaster<br />
incidences <strong>to</strong> public / NGOs etc.<br />
The call centre agents will<br />
record updates on the<br />
incidences that can be accessed<br />
by people dialing in on the IVR.<br />
<strong>No</strong> change in specifications<br />
Please note that these calls are<br />
<strong>to</strong> be made <strong>to</strong> discuss regarding<br />
disaster situations and<br />
temporary drop in quality <strong>to</strong><br />
meet operational requirements<br />
will be <strong>to</strong>lerated. Connectivity<br />
requirements are the priority.<br />
<strong>No</strong> Change. Opera<strong>to</strong>r is<br />
expected <strong>to</strong> design the systems<br />
<strong>to</strong> meet operational<br />
requirements