18.04.2015 Views

CORRIGENDUM NO. 3 to RFP Notice No. 10 of 2013 - Gujarat State ...

CORRIGENDUM NO. 3 to RFP Notice No. 10 of 2013 - Gujarat State ...

CORRIGENDUM NO. 3 to RFP Notice No. 10 of 2013 - Gujarat State ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8<br />

9<br />

<strong>10</strong><br />

11<br />

12<br />

<strong>10</strong>5<br />

2/246<br />

and<br />

5/249<br />

Videoconferencin<br />

g Room / Display<br />

facilities<br />

a) Systems and<br />

sub systems <strong>to</strong> be<br />

tested<br />

b)Equipment<br />

installed at ERC,<br />

DEOC and TEOC in<br />

standalone modes<br />

and in network<br />

mode<br />

<strong>10</strong>7 1.3.5 Call Center NA<br />

Page 150<br />

-<br />

<strong>No</strong>minal<br />

specifications for<br />

Multipoint Control<br />

Unit<br />

<strong>No</strong>minal<br />

specifications for<br />

Multipoint Control<br />

Unit<br />

Large VC camera <strong>to</strong> cover every<br />

person in the room with<br />

capability <strong>to</strong> track speaker<br />

au<strong>to</strong>matically<br />

a) Systems and sub systems <strong>to</strong><br />

be tested b)Equipment<br />

installed at ERC, DEOC and TEOC<br />

in standalone modes and in<br />

network mode<br />

Conferencing capability<br />

addition<br />

Please delete "capability <strong>to</strong> track speaker<br />

au<strong>to</strong>matically" (i) the au<strong>to</strong> tracking works<br />

erroneously in such a briefing room with<br />

multiple participants. (ii) The ideal range<br />

<strong>of</strong> the au<strong>to</strong> tracking is normally 23 feet,<br />

thus a large size room with 24 participants<br />

having 12 seats on one side <strong>of</strong> the table<br />

this will not work well. (iii) Au<strong>to</strong> tracking is<br />

a proprietary feature <strong>of</strong> only one OEM.<br />

This limits the competition.<br />

Pl clarify the Standalone and network<br />

mode….….. Does Standalone mode refer<br />

<strong>to</strong> survivability <strong>of</strong> the DEOC and TEOC<br />

location?<br />

Tender is looking for IVR system. Request<br />

you please share the IVR call flow & what<br />

all services are <strong>to</strong> be extended on IVR. Is it<br />

also expected o integrate the IVR / ACD<br />

system with the backend Portal / DB.<br />

Would request the resolution at which<br />

such calls are <strong>to</strong> be made as <strong>10</strong>0<strong>No</strong>s. 720p<br />

resolution calls would not be the same as<br />

<strong>10</strong>0<strong>No</strong>s. CIF calls, would also request for<br />

dynamic allocation <strong>of</strong> resources such that<br />

<strong>10</strong>0<strong>No</strong>. 720p calls or 400<strong>No</strong>s. VoIP calls<br />

could be specified instead <strong>of</strong> <strong>10</strong>0<br />

video/voice which is ambiguous.<br />

Request the clause for Scalability <strong>to</strong> higher<br />

capacity without change in main hardware<br />

, by either cards or licenses as and when<br />

required<br />

Requirements are worked out<br />

on the basis <strong>of</strong> needs <strong>of</strong> the<br />

organization and not on<br />

manufacturer.<br />

<strong>No</strong> change<br />

Standalone mode will check<br />

connectivity <strong>of</strong> various<br />

equipment within a location,<br />

where as network mode applies<br />

<strong>to</strong> interconnectivity <strong>of</strong> all nodes<br />

on statewide networks. This<br />

doesn't refer <strong>to</strong> survivability <strong>of</strong><br />

DEOC , and TEOC<br />

IVR is meant for dissemination<br />

<strong>of</strong> updates on disaster<br />

incidences <strong>to</strong> public / NGOs etc.<br />

The call centre agents will<br />

record updates on the<br />

incidences that can be accessed<br />

by people dialing in on the IVR.<br />

<strong>No</strong> change in specifications<br />

Please note that these calls are<br />

<strong>to</strong> be made <strong>to</strong> discuss regarding<br />

disaster situations and<br />

temporary drop in quality <strong>to</strong><br />

meet operational requirements<br />

will be <strong>to</strong>lerated. Connectivity<br />

requirements are the priority.<br />

<strong>No</strong> Change. Opera<strong>to</strong>r is<br />

expected <strong>to</strong> design the systems<br />

<strong>to</strong> meet operational<br />

requirements

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!