CORRIGENDUM NO. 3 to RFP Notice No. 10 of 2013 - Gujarat State ...
CORRIGENDUM NO. 3 to RFP Notice No. 10 of 2013 - Gujarat State ...
CORRIGENDUM NO. 3 to RFP Notice No. 10 of 2013 - Gujarat State ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
181<br />
182<br />
183 Page<br />
92<br />
184 Page<br />
92<br />
Section<br />
2.2:-<br />
Connecti<br />
vity and<br />
Internet<br />
working<br />
requirem<br />
ents<br />
Section<br />
2.3 :-<br />
Core<br />
Service<br />
Require<br />
ments<br />
Schedule II -<br />
GSDR-ICTS<br />
Technical<br />
Requirements<br />
Schedule II -<br />
GSDR-ICTS<br />
Technical<br />
Requirements<br />
Establish LAN at ERC and<br />
disaster location using wired or<br />
wireless medium<br />
Video / data analysis<br />
2. UNIVERSAL INTERFACE SYSTEEM (UIS)<br />
a) Will any other device other than<br />
Universal communication Interface be<br />
connected with the VSAT IDU (modem)<br />
over L AN (RJ 45) ports (i.e. IP interface)?<br />
Please confirm.<br />
b) Does UIS support SIP signaling for VoIP?<br />
[As UIS will convert wireless<br />
communication <strong>to</strong> Internet Pro<strong>to</strong>col (IP)<br />
format and VoIP Gateway will be installed<br />
at the SEOC, which means it supports SIP<br />
Signaling for VoIP] Please confirm?<br />
c) Will this box be connecting <strong>to</strong> VSAT<br />
Modem over LAN (RJ45) port for the<br />
communication between ERVs & SEOC on<br />
IP pro<strong>to</strong>col?<br />
d) Provide the specifications/capability<br />
details <strong>of</strong> this Universal Interface System.<br />
e) Schematic Diagram <strong>of</strong> Universal<br />
Interface system showing the traffic flow<br />
<strong>of</strong> VHF system and VSAT system.<br />
3. What should be the height <strong>of</strong> telescopic<br />
mast with portable VSAT system <strong>to</strong> install<br />
the Wireless antenna?<br />
Q: Do the Opera<strong>to</strong>r need <strong>to</strong> setup<br />
dynamically the fixed EOC at disaster<br />
location on demand in addition <strong>to</strong> the ERV<br />
set up at disaster locations? Please clarify<br />
with more details.<br />
Q: Need more details on Video / Data<br />
Analysis requirements.<br />
a) One more LAN port for<br />
videoconferencing, voice<br />
communication, data<br />
communication etc. is<br />
necessary,<br />
b) Yes<br />
c) Yes<br />
d) Please refer <strong>to</strong> page 259<br />
e) UIS is a standard solution<br />
available from many OEMs,<br />
hence this information is not<br />
included in the <strong>RFP</strong><br />
Around 5.0 Meters (16 feet) for<br />
coverage area <strong>of</strong> 2.0 KM radius<br />
<strong>No</strong>. ERV specifications only are<br />
<strong>to</strong> be satisfied.<br />
Video and data analysis is <strong>to</strong><br />
support decision making by<br />
updated status <strong>of</strong> disaster<br />
incidence.