70<br />
The network will be operational on any<br />
INSAT series satellite in Ku Band. Please<br />
provide basic satellite parameters so that<br />
sample link budgets can be prepared<br />
What should be the concurrency fac<strong>to</strong>r in<br />
71<br />
the network? This is required for<br />
calculating inbound and outbound<br />
bandwidth for the network<br />
As voice and video will be prime<br />
72<br />
applications in the network, so do you<br />
require a RTT <strong>of</strong> less than 700 ms?<br />
73 Do you require multicast from remote <strong>to</strong><br />
remote or remote <strong>to</strong> hub?<br />
There are technically 2 requirements for<br />
Au<strong>to</strong> Geographic Hub Redundancy as<br />
required in the tender:<br />
a. 1. Both the Hubs should have the<br />
identical/similar Baseband technologies<br />
74<br />
b. Both the Hubs should operate on the<br />
same Satellite and Frequency Band<br />
Secondly, as per the regulations, the<br />
Shared Hub Service Providers may not<br />
operate Moving and Moveable Sites<br />
(Vehicle Mount/Fly-aways), so these sites<br />
may not operate on Shared Hub license<br />
The satellite capacity will be<br />
provided by Antrix on available<br />
satellite after installation and<br />
commissioning <strong>of</strong> the hub. The<br />
location arc <strong>of</strong> the satellite is<br />
indicated <strong>to</strong> ensure antenna<br />
tracking capabilities. <strong>RFP</strong> has<br />
included specifications for<br />
antenna and RF components<br />
that can support transmission<br />
up <strong>to</strong> 45.0 Mbps carrier on any<br />
satellite even with minimum<br />
G/T. GSDMA network<br />
requirement is only around 5.0<br />
Mbps outroute carrier as such<br />
no difficulty will be experienced<br />
for operation with any satellite.<br />
Suggested bandwidth will be<br />
sufficient for peak traffic loads<br />
at respective nodes. The node at<br />
SEOC may be at 16.0 mbps rate.<br />
One way (end <strong>to</strong> end) delay <strong>of</strong><br />
700 Ms. Is acceptable<br />
Yes<br />
Decision on hub redundancy will<br />
be taken by GSDMA in future.