70<br />

The network will be operational on any<br />

INSAT series satellite in Ku Band. Please<br />

provide basic satellite parameters so that<br />

sample link budgets can be prepared<br />

What should be the concurrency fac<strong>to</strong>r in<br />

71<br />

the network? This is required for<br />

calculating inbound and outbound<br />

bandwidth for the network<br />

As voice and video will be prime<br />

72<br />

applications in the network, so do you<br />

require a RTT <strong>of</strong> less than 700 ms?<br />

73 Do you require multicast from remote <strong>to</strong><br />

remote or remote <strong>to</strong> hub?<br />

There are technically 2 requirements for<br />

Au<strong>to</strong> Geographic Hub Redundancy as<br />

required in the tender:<br />

a. 1. Both the Hubs should have the<br />

identical/similar Baseband technologies<br />

74<br />

b. Both the Hubs should operate on the<br />

same Satellite and Frequency Band<br />

Secondly, as per the regulations, the<br />

Shared Hub Service Providers may not<br />

operate Moving and Moveable Sites<br />

(Vehicle Mount/Fly-aways), so these sites<br />

may not operate on Shared Hub license<br />

The satellite capacity will be<br />

provided by Antrix on available<br />

satellite after installation and<br />

commissioning <strong>of</strong> the hub. The<br />

location arc <strong>of</strong> the satellite is<br />

indicated <strong>to</strong> ensure antenna<br />

tracking capabilities. <strong>RFP</strong> has<br />

included specifications for<br />

antenna and RF components<br />

that can support transmission<br />

up <strong>to</strong> 45.0 Mbps carrier on any<br />

satellite even with minimum<br />

G/T. GSDMA network<br />

requirement is only around 5.0<br />

Mbps outroute carrier as such<br />

no difficulty will be experienced<br />

for operation with any satellite.<br />

Suggested bandwidth will be<br />

sufficient for peak traffic loads<br />

at respective nodes. The node at<br />

SEOC may be at 16.0 mbps rate.<br />

One way (end <strong>to</strong> end) delay <strong>of</strong><br />

700 Ms. Is acceptable<br />

Yes<br />

Decision on hub redundancy will<br />

be taken by GSDMA in future.