18.04.2015 Views

CORRIGENDUM NO. 3 to RFP Notice No. 10 of 2013 - Gujarat State ...

CORRIGENDUM NO. 3 to RFP Notice No. 10 of 2013 - Gujarat State ...

CORRIGENDUM NO. 3 to RFP Notice No. 10 of 2013 - Gujarat State ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

88<br />

89<br />

90<br />

91<br />

92<br />

93<br />

94<br />

95<br />

96<br />

General<br />

General<br />

General<br />

General<br />

General<br />

General<br />

General<br />

General<br />

General<br />

Request <strong>to</strong> confirm the position <strong>of</strong> all the<br />

equipments like UPS, batteries, Electrical<br />

panels & DG set<br />

Request <strong>to</strong> provide <strong>to</strong>tal Power required<br />

for SEOC<br />

Request <strong>to</strong> provide <strong>to</strong>tal Power required<br />

for DEOC<br />

Request <strong>to</strong> provide <strong>to</strong>tal Power required<br />

for TEOC<br />

Request <strong>to</strong> provide <strong>to</strong>tal capacity <strong>of</strong> UPS &<br />

back up time required for SEOC<br />

Request <strong>to</strong> provide <strong>to</strong>tal capacity <strong>of</strong> UPS &<br />

back up time required for DEOC<br />

Request <strong>to</strong> provide <strong>to</strong>tal capacity <strong>of</strong> UPS &<br />

back up time required for TEOC<br />

Request <strong>to</strong> provide <strong>to</strong>tal capacity <strong>of</strong> DG &<br />

back up time required for SEOC<br />

Request <strong>to</strong> provide <strong>to</strong>tal capacity <strong>of</strong> DG &<br />

back up time required for DEOC<br />

Site visit will provide necessary<br />

details.<br />

Power requirements depend<br />

upon opera<strong>to</strong>r's design. Existing<br />

systems such as lighting, airconditioning<br />

are already catered<br />

for.<br />

Power requirements depend<br />

upon opera<strong>to</strong>r's design. Existing<br />

systems such as lighting, airconditioning<br />

are already catered<br />

for.<br />

Power requirements depend<br />

upon opera<strong>to</strong>r's design. Existing<br />

systems such as lighting, airconditioning<br />

are already catered<br />

for.<br />

Please refer <strong>to</strong> detailed specs<br />

and testing conditions in <strong>RFP</strong><br />

Please refer <strong>to</strong> detailed specs<br />

Please refer <strong>to</strong> detailed specs<br />

Please refer <strong>to</strong> existing<br />

equipment details for DG set<br />

requirement. Opera<strong>to</strong>r has <strong>to</strong><br />

ensure back-up genera<strong>to</strong>r and<br />

fuels supply <strong>to</strong> last up <strong>to</strong> at least<br />

48 hours <strong>to</strong> ensure continuity <strong>of</strong><br />

operations<br />

Opera<strong>to</strong>r has <strong>to</strong> provide back-up<br />

for his equipment, lighting and<br />

air-conditioning (for 20.0 Sq.<br />

Meters) area at DEOC. Should<br />

also provide fuel for at least up<br />

<strong>to</strong> 48 hours <strong>of</strong> operations

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!