ANNUAL REPORT 2004 - ELMOS Semiconductor AG
ANNUAL REPORT 2004 - ELMOS Semiconductor AG
ANNUAL REPORT 2004 - ELMOS Semiconductor AG
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
GROUP STATUS <strong>REPORT</strong> FINANCIAL STATEMENTS GROUP STRUCTURE GLOSSARY<br />
ÿ Business and economic framework<br />
Future of automotive electronics<br />
Profit, financial and assets situation<br />
Supplementary report<br />
Risk report<br />
Outlook report<br />
Cooperation with IMS<br />
secures additional capacity<br />
Since the end of 2003, <strong>ELMOS</strong> has carried on a cooperation project with the Fraun-<br />
hofer Institute for Microelectronic Circuits and Systems (IMS) in Duisburg with the<br />
objective to conclude a contract with the Fraunhofer Gesellschaft on the use and<br />
operation of the institute’s production line in order to further secure sufficient pro-<br />
duction capacity. The IMS runs a 200mm wafer line (corresponds with 8 inches) for<br />
research purposes. From today’s perspective a capacity of up to 200 wafer starts a<br />
day can be established for <strong>ELMOS</strong>. In the year <strong>2004</strong> the process transfer was begun<br />
with on schedule and first test batches were manufactured in Duisburg. In 2005 the<br />
first products are scheduled to be qualified on the 200mm line, allowing for the start<br />
of first serial manufacture in 2006.<br />
Because production on the larger 200mm wafers is less expensive, the IMS capacity<br />
is intended to be utilized first. Subsequently, the Dortmund capacity will be subject<br />
to expansion based on 150mm or even 200mm wafers.<br />
Regardless of that an expansion of the testing (backend) area capacity in Dortmund<br />
is necessary in the year 2005 already. The initial plan provided for the gradual move<br />
of backend capacity towards the Dutch subsidiary <strong>ELMOS</strong> Advanced Packaging. How-<br />
ever, the construction of a backend clean room of suitable size either in the Nether-<br />
lands or in Germany is inevitable. The decision favored the expansion in Dortmund<br />
due to the advantage that the entire backend operation will be carried out at one<br />
location under one management.<br />
In addition to the assembly, <strong>ELMOS</strong> Advanced Packaging in the Netherlands will take<br />
over the production steps packing and logistics which were carried out in Dortmund<br />
before. The future added value chain will look the following:<br />
Production steps of an <strong>ELMOS</strong> ASIC<br />
FRONTEND<br />
<strong>ELMOS</strong> Dortmund<br />
ON-WAFER-TEST<br />
<strong>ELMOS</strong> Dortmund<br />
ASSEMBLY<br />
<strong>ELMOS</strong> Advanced<br />
Packaging, NL<br />
IMS Duisburg Far East<br />
FINAL-PART-TEST<br />
<strong>ELMOS</strong> Dortmund<br />
PACKING &<br />
DISPATCH<br />
<strong>ELMOS</strong> Advanced<br />
Packaging, NL<br />
elmos annual report <strong>2004</strong><br />
41