- Page 2 and 3:
WATER SUPPLY MASTER PLAN UPDATETECH
- Page 6 and 7:
to review results of selected tasks
- Page 8 and 9:
12108642Manatee CountyPeace River A
- Page 10 and 11:
20” and LargerWater MainsCounty S
- Page 12:
Carlton WTF Average Monthly WaterPr
- Page 15 and 16:
Table 2.1Summary of Carlton WTF Des
- Page 17 and 18:
Table 2.1Summary of Carlton WTF Des
- Page 19 and 20:
advisory alarm mode if they exceed
- Page 21 and 22:
Table 2.2Carlton WTF Chemical Stora
- Page 23 and 24:
2.3.1.6 Planned Future Upgrades or
- Page 25 and 26:
facility will need to increase staf
- Page 27 and 28:
The existing WUP was issued in Sept
- Page 29 and 30:
Building 1AF-600H 2SO 4Raw WaterBle
- Page 31 and 32:
Table 2.4 Summary of Venice Gardens
- Page 33 and 34:
Building 2 - The RO systems in Buil
- Page 35 and 36:
2.3.2.1.6 Concentrate DisposalResid
- Page 37 and 38:
• The facility is not equipped wi
- Page 39 and 40:
University Wellfield Average Monthl
- Page 41 and 42:
University WTF Process SchematicFro
- Page 43 and 44:
via a 0.5-hp chemical metering pump
- Page 45 and 46:
• The discharge flow meter assemb
- Page 48:
The County distribution system does
- Page 51 and 52:
• Pump Station No. 5 (PS5) - PS5
- Page 53 and 54:
2.4.3.1 Storage Tank UtilizationDue
- Page 55 and 56:
particular duration of time. The Am
- Page 57:
All automatic flushing units are po
- Page 61 and 62:
2.5.1 Manatee County InterconnectsS
- Page 63 and 64:
2.5.4 Siesta Key InterconnectsThe C
- Page 65 and 66:
• The chlorine and ammonia chemic
- Page 67 and 68: Appendix ACARLTON WELLFIELDH:\Clien
- Page 69 and 70: Water Supply Master Plan UpdateSara
- Page 71 and 72: Carlton Site Visit - May 19, 2005Ge
- Page 73 and 74: • Some PLCs have been upgraded to
- Page 75 and 76: Carlton Site Visit - May 26, 2005Ge
- Page 77 and 78: Appendix CJACARANDA WELLFIELDH:\Cli
- Page 79 and 80: Appendix DNOTES FROM INTERVIEW WITH
- Page 81 and 82: • Wells 6 and 7 supply the refurb
- Page 83 and 84: Venice Gardens Site Visit - June 2,
- Page 85 and 86: Appendix EUNIVERSITY WELLFIELDH:\Cl
- Page 88 and 89: Figure E.1 University Well #2FINAL
- Page 90 and 91: Distribution System Site Visits - M
- Page 92 and 93: Distribution System Site Visits - A
- Page 94 and 95: Water Supply Master Plan UpdateSara
- Page 96 and 97: Water Supply Master Plan UpdateSara
- Page 98 and 99: 1.1 Pump CurvesPump curves for each
- Page 103: Pump Station No. 2
- Page 117: SKUA Pump Station No. 1 - Oakmont P
- Page 126: SKUA Pump Station No. 4 - Midnight
- Page 134 and 135: Water Supply Master Plan UpdateSara
- Page 136 and 137: Figure H.3 Elevated Storage Tank #2
- Page 138 and 139: Appendix IAUTOMATIC FLUSHING UNITSH
- Page 140 and 141: Figure I.1 Automatic Flushing Unit
- Page 142 and 143: Water Supply Master Plan UpdateSara
- Page 144 and 145: Figure J.3 Siesta Key Interconnect