10.07.2015 Views

CLIENT NAME - Sarasota.WaterAtlas.org

CLIENT NAME - Sarasota.WaterAtlas.org

CLIENT NAME - Sarasota.WaterAtlas.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Venice Gardens Site Visit - June 1, 2005General Notes• Venice Gardens has several planned projects in various stages of completion/planning:o New high service pumps station currently in final stages of completion. Thepumps are operating and final site restoration and building construction willbe complete soon.o The old membrane system (in Building 2) will be upgraded with newmembranes, some chemical feed improvements, and instrumentation forflow, pH, and conductivity. The 5 high pressure feed pumps and motors willalso be rebuilt. When these improvements are made, they will bring Wells#1-5 online to begin producing water through this train.• Problems mentioned by facility staff include:o No backup concentrate disposal.o Main onsite wastewater lift station needs to be upgraded.o The onsite generator cannot power the entire facility. A generator upgradewill be needed in the future. The existing generator could be used to poweroffsite wells. None of the offsite wells have backup generators.o The old sulfuric acid tank outside of Building 2 had a chemical leak thatcorroded much of the containment area. If pH adjustment is needed for thenew membranes, a new acid tank is needed. However, facility staff arelooking at a different antiscalant that may not require pH adjustment.• Potential changes to be made in plant suggested by facility staff:o Reject transfer station is needed as a back up to the deep injection well. Thefacility has no backup for concentrate disposal in case of deep injection wellproblems. The piping and hydropnuematic tank is already in place to transferto another deep injection well.o A Venturi meter on the total finished water prior to disinfection would behelpful. Currently they have 2 paddle wheel meters for each of the productwaters.• The wellfield has 2 monitoring wells.• Roofs on both buildings have been upgraded recently.• AF-600 needs to be plumbed to Building 2.FINAL - August 31, 2005 D-2H:\Client\SAR Co_SAR\6873C00 WATER SUPPLY MASTER PLAN UPDATE\Deliverables\TM 2 - Water System Assets\Final\Appendix D -Final.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!