- Page 2 and 3: WATER SUPPLY MASTER PLAN UPDATETECH
- Page 6 and 7: to review results of selected tasks
- Page 8 and 9: 12108642Manatee CountyPeace River A
- Page 10 and 11: 20” and LargerWater MainsCounty S
- Page 12: Carlton WTF Average Monthly WaterPr
- Page 17 and 18: Table 2.1Summary of Carlton WTF Des
- Page 19 and 20: advisory alarm mode if they exceed
- Page 21 and 22: Table 2.2Carlton WTF Chemical Stora
- Page 23 and 24: 2.3.1.6 Planned Future Upgrades or
- Page 25 and 26: facility will need to increase staf
- Page 27 and 28: The existing WUP was issued in Sept
- Page 29 and 30: Building 1AF-600H 2SO 4Raw WaterBle
- Page 31 and 32: Table 2.4 Summary of Venice Gardens
- Page 33 and 34: Building 2 - The RO systems in Buil
- Page 35 and 36: 2.3.2.1.6 Concentrate DisposalResid
- Page 37 and 38: • The facility is not equipped wi
- Page 39 and 40: University Wellfield Average Monthl
- Page 41 and 42: University WTF Process SchematicFro
- Page 43 and 44: via a 0.5-hp chemical metering pump
- Page 45 and 46: • The discharge flow meter assemb
- Page 48: The County distribution system does
- Page 51 and 52: • Pump Station No. 5 (PS5) - PS5
- Page 53 and 54: 2.4.3.1 Storage Tank UtilizationDue
- Page 55 and 56: particular duration of time. The Am
- Page 57: All automatic flushing units are po
- Page 61 and 62: 2.5.1 Manatee County InterconnectsS
- Page 63 and 64:
2.5.4 Siesta Key InterconnectsThe C
- Page 65 and 66:
• The chlorine and ammonia chemic
- Page 67 and 68:
Appendix ACARLTON WELLFIELDH:\Clien
- Page 69 and 70:
Water Supply Master Plan UpdateSara
- Page 71 and 72:
Carlton Site Visit - May 19, 2005Ge
- Page 73 and 74:
• Some PLCs have been upgraded to
- Page 75 and 76:
Carlton Site Visit - May 26, 2005Ge
- Page 77 and 78:
Appendix CJACARANDA WELLFIELDH:\Cli
- Page 79 and 80:
Appendix DNOTES FROM INTERVIEW WITH
- Page 81 and 82:
• Wells 6 and 7 supply the refurb
- Page 83 and 84:
Venice Gardens Site Visit - June 2,
- Page 85 and 86:
Appendix EUNIVERSITY WELLFIELDH:\Cl
- Page 88 and 89:
Figure E.1 University Well #2FINAL
- Page 90 and 91:
Distribution System Site Visits - M
- Page 92 and 93:
Distribution System Site Visits - A
- Page 94 and 95:
Water Supply Master Plan UpdateSara
- Page 96 and 97:
Water Supply Master Plan UpdateSara
- Page 98 and 99:
1.1 Pump CurvesPump curves for each
- Page 103:
Pump Station No. 2
- Page 117:
SKUA Pump Station No. 1 - Oakmont P
- Page 123:
SKUA Pump Station No. 3 - Stickney
- Page 133 and 134:
Appendix HWATER STORAGE TANKSH:\Cli
- Page 135 and 136:
Figure H.1 Elevated Tank #1Figure H
- Page 137 and 138:
Figure H.5 Pump Station No. 3 Groun
- Page 139 and 140:
Water Supply Master Plan UpdateSara
- Page 141 and 142:
Appendix JWATER SYSTEM INTERCONNECT
- Page 143 and 144:
Figure J.1 Manatee County Interconn
- Page 145:
Figure J.5 Siesta Key to City of Sa